My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/18/2022
CBCC
>
Meetings
>
2020's
>
2022
>
01/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 11:25:10 AM
Creation date
3/10/2022 11:03:00 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/18/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT NO.1 <br />WORK ORDER NUMBER 44 <br />LANDFILL GAS FLARE SKID IMPROVEMENTS AND PIPELINE EXTENSION <br />EXHIBIT A <br />SCOPE OF WORK <br />PROJECT UNDERSTANDING <br />Indian River County (County) Solid Waste Disposal District (SWDD) currently relies on <br />a candlestick flare for landfill gas (LFG) emissions. The current blower flare skid was <br />installed in 2004 and is in need of updating and reconfiguration for overall performance <br />and efficiency, and to accommodate the renewable natural gas (RNG) project that is in <br />development with the Indian River Eco District (IRED). In addition, SWDD is working <br />with a third -party to install a leachate evaporation system that may utilize landfill gas as a <br />fuel source. To accommodate the RNG and evaporation projects, modifications to the LFG <br />skid and an extension to the LFG pipeline are required. The proposed modifications will <br />improve the LFG collection and control system by providing reliable vacuum pressure to <br />the gas wellfield and ensure continuous delivery of dry, pressurized LFG to the evaporation <br />and RNG projects. <br />Kimley-Horn and Associates, Inc. (Consultant) has partnered with BioGas Engineering <br />(BioGas) to design, permit and bid the proposed improvements. The BioGas proposal is <br />incorporated herein and provided as Attachment 1 to this Scope of Work for informational <br />purposes. The Consultant team will design, permit, and prepare a bid package for the <br />proposed improvements as outlined in the following Scope of Services. Services during <br />construction are not included in this Scope of Services. <br />SCOPE OF SERVICES <br />Task 1: Landfill Gas Pipeline Design <br />Subtask 1.1.3 has been amended as noted below. <br />Subtask 1.1 Preliminary Design Activities <br />1.1.1 Alignment for Survey Purposes <br />No changes. <br />1. 1.2 Survey <br />No changes. <br />1.1.3 Geotechnical Data <br />The consultant will modify the subcontract with a local geotechnical engineering <br />consultant who routinely performs work for the County on the SWDD property to <br />perform additional services to collect geotechnical data in several additional <br />176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.