My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/18/2022
CBCC
>
Meetings
>
2020's
>
2022
>
01/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 11:25:10 AM
Creation date
3/10/2022 11:03:00 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/18/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
locations. The additional borings are required to supplement the previously <br />budgeted hand auger samples, for structural purposes. <br />Subtask 1.2 Landfill Gas Pipeline Design <br />1.2.1 30 Percent Design <br />No changes. <br />1.2.2 60 Percent Design <br />No changes. <br />1.2.3 90 Percent Design and Final Bid Package <br />No changes <br />1.2.4 Bidding and Project Management <br />This task has been amended to accommodate minor changes in project scope and <br />schedule. <br />Subtask 1.3 Coordination with Heartland <br />The coordination efforts with the Heartland design team have required more effort than <br />initially anticipated. This task has been modified to accommodate additional efforts <br />related to the original scope (as summarized immediately below). <br />The Consultant will work closely with the County and Heartland to review the overall <br />design, equipment specifications and construction plan of the evaporation system. The <br />Consultant will serve as the Owner's representative and will review the details of the <br />system integration between the Heartland Facility equipment and SWDD's proposed <br />landfill assets. This task will include the following activities: <br />■ Allocate and assign key engineering resources (such as controls, mechanical, and <br />process engineers) as necessary to support the project during critical design review <br />stages; <br />■ Review detailed drawings, calculations and other information submitted by the <br />Heartland engineering team. These may include natural gas and LFG piping <br />designs, mechanical piping drawings, electrical and controls designs for valves, <br />instruments and other electrical equipment that could affect the landfill assets. <br />■ Review the master project schedule and provide comments to SWDD regarding <br />risks in achieving critical milestones by the developer. Please note that to do this, <br />the Consultant will request monthly schedule updates from Heartland and provide <br />comments as necessary. <br />■ The Consultant will monitor the engineering and coordination performed by <br />developer/contractor of the facility. <br />■ The Consultant will review all design and equipment specifications regarding the <br />integration of piping with the landfill system. <br />■ Perform site visits if necessary (travel expenses to be invoiced as incurred for the <br />necessary number of site visits). <br />177 <br />
The URL can be used to link to this page
Your browser does not support the video tag.