My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/18/2022
CBCC
>
Meetings
>
2020's
>
2022
>
01/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 11:25:10 AM
Creation date
3/10/2022 11:03:00 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/18/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2: Landfill Gas Skid Design <br />Subtasks 2.5 and 2.6 have been modified to accommodate minor changes to the scope of <br />the project. <br />Subtask 2.1 Request for Information <br />No changes. <br />Subtask 2.2 30 Percent Design <br />No changes. <br />Subtask 2.3 60 Percent Design <br />No changes. <br />Subtask 2.4 90 Percent Design and Final Bid Package <br />No changes. <br />Subtask 2.5 Bidding and Project Management <br />This task has been amended to provide for additional project management and <br />coordination efforts. <br />Subtask 2.6 Permitting <br />The initial design assumed that no stormwater permitting (County or FDEP) would be <br />required; however, due to the impacts from each of the ongoing projects (cumulatively), <br />and potential modifications to the stormwater system and swale configuration in the <br />vicinity of the evaporation system, the cumulative impacts appear to trigger the need for a <br />modification to the County's Environmental Resource Permit (ERP). This task is being <br />amended to provide coordination efforts for each project's drainage configuration, as well <br />as coordination with the County's consultant responsible for the system -wide stormwater <br />model (Geosyntec) to facilitate the permit modification. The permit modification and <br />modeling updates will be performed by Geosyntec. The Consultant will compile the <br />drawings (design by each projects' design team) and supporting documents needed to <br />support an ERP permit modification (less modeling efforts). <br />Task 3 (NEW): SCADA Coordination and Electrical Considerations <br />As the ongoing projects have progressed through preliminary design, it has become <br />apparent that an overall SCADA control system would be needed to monitor and operate <br />the evaporation system, leachate storage tank (including pumps and water level <br />transducers) and the updated landfill gas skid. The landfill is not currently equipped with a <br />SCADA system, but the underlying fiber optic network needed to support a new SCADA <br />system is in place. This task will include coordination with each project design team, the <br />County's third -party SCADA integrator, and the equipment suppliers to facilitate the <br />development of a SCADA system for the landfill. This task does not include design or <br />integration services for the SCADA system. <br />178 <br />
The URL can be used to link to this page
Your browser does not support the video tag.