Laserfiche WebLink
The evaporation system/leachate storage tank will also require minor electrical <br />improvements to support a new control panel and SCADA equipment. This task will <br />include up to 24 hours of effort for the Consultant's electrical engineer to prepare drawings <br />limited to this panel. The panel will include provisions for a portable generator receptacle. <br />179 <br />