My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-039
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 10:22:35 AM
Creation date
3/11/2022 10:21:41 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/15/2022
Control Number
2022-039
Agenda Item Number
15.B.3.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order 15 for C&D Landfill Permit Renewal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. Managing Director Geosyntec <br />2 February 2022 <br />Page 4 consultants <br />which is still valid, will not be re -submitted for the permit renewal. The permit renewal application <br />will list and reaffirm that the information is still valid (i.e., no change). <br />Activities required for compilation, reproduction, and distribution of the permit application are <br />included in this phase. Geosyntec will provide one (1) electronic and one (1) hardcopy of the <br />permit renewal application to FDEP Tallahassee and two (2) copies (1 electronic and 1 hardcopy) <br />to SWDD. <br />The renewal permit application fee will be $1,000 for the 5 -year operation permit. Geosyntec has <br />assumed that SWDD will issue the check for the permit fee. <br />Phase 3 — Response to Regulatory Comments <br />Following submittal of the permit renewal Application, Geosyntec will schedule a teleconference <br />with the Tallahassee office of the FDEP Solid Waste Section to present and discuss the application <br />package. Geosyntec will provide FDEP with written responses to RAIs throughout the course of <br />the permit application review process. For the purpose of the budget estimate, Geosyntec has <br />estimated two responses to FDEP RAIs will be required. <br />Geosyntec will also review and provide comments on the draft Solid Waste Permit issued by FDEP <br />to ensure that it is consistent with the facility requirements and does not contain unexpected <br />compliance and monitoring requirements. <br />SCHEDULE <br />Geosyntec has prepared a schedule for preparing the five-year Solid Waste Permit renewal, which <br />is included as Attachment 1. The schedule, as presented, assumes a start date of 8 February 2022, <br />and projects a C&D Debris Disposal Facility Solid Waste Renewal Permit Application submittal <br />to FDEP by 12 May 2022 to ensure that the application would be considered "timely and <br />sufficient" by FDEP (that is, more than 61 days prior to the expiration of permit). Geosyntec has <br />assumed that the required permit will be obtained within three months of submission. Response <br />to FDEP comments and review of draft permit issued by FDEP will be performed during this three- <br />month period. Therefore, it is anticipated that the final renewal permit will be issued by 13 July <br />2022. <br />Geosyntec will work with SWDD to refine the project schedule and set the milestones necessary <br />to meet the needs of the project. Throughout the duration of the project, Geosyntec will work <br />diligently to meet those milestones and the schedule developed for the project. <br />NCP2021-3442\JL21092_IRC CD Debris Disposal Facility Permit Renewal Application FINAL <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.