Laserfiche WebLink
C <br />0WWrIVES - C. POTABLE WATER STATUS ACTIONS TAKEN <br />1. Conserve and protect all sources of PC <br />- reverse osmosis (RO) Plant <br />water resources from pollution and <br />established <br />overutilization <br />- landscape ordinance adopted <br />proposed have sufficient drainage <br />- coordination with the Dept. <br />capability. <br />of Environmental Health <br />2. Enhance water quality values through PC <br />and SJIWM <br />2. Provide those users within the urban C <br />- reverse osmosis (RD) Plant <br />service area with an economical water <br />established <br />service. <br />- proposal and design of north <br />county regional water plant <br />3. The county shall establish innovative C <br />- extension of county system <br />means for extension of safe and effici- <br />capacity by 3.03 mgd <br />ent potable water service. <br />million gallons per day) <br />OBJECTIVES - D. DRAINAGE STATUS <br />AZIONS TAKEN <br />1. Insure that all areas of the county C <br />- adopted stormwater management <br />where development is existing or <br />ordinance <br />proposed have sufficient drainage <br />capability. <br />2. Enhance water quality values through PC <br />- stormwater treatment detent- <br />use of drainage practices which will <br />ion ponds requiredby devel- <br />eliminate pollutant loadings from <br />oper <br />receiving waters. <br />- installed storm sewer culvert <br />at 12th and 16th Streets east <br />of 20th Ave <br />3. Coordinate with the St. Johns River C <br />water management district, the munic- <br />ipalities, and the drainage districts <br />in solving drainage problems on a <br />county -wide basis. <br />4. The county will support development of U <br />a comprehensive area -wide surface man- <br />agement program. <br />5. The county will encourage development of PC <br />drainage facilities in unincorporated <br />areas meeting priority needs. <br />21 <br />- coordination is maintained <br />- proposals have been developed <br />- nothing tangible established <br />- facilities developed and <br />maintained as needed <br />- Lateral H is 00% complete <br />