Laserfiche WebLink
El <br />OBJECTIVES - E. SOLID ;4ASTE STATUS AC21ONS TAKEN <br />1. The county will continue to serve as C - solid waste disposal district <br />the responsible local government for established <br />developing and operating solid waste - new segment of landfill <br />disposal facilities. developed <br />2. The county will study possible re- C - completed as part of solid <br />source recovery methods and will waste master plan <br />undertake approaches which prove to - solid waste recycling program <br />be economically feasible, established by July 1, 1989 <br />to reduce volume <br />OBJECTIVES - F. TRANSPORTATION STATUS ACTIONS TAKEN <br />1. Develop an effective traffic circu- C <br />lation system which meets existing <br />and anticipated needs of ^ounty <br />residents. <br />2. Provide adequate safety standards in C <br />the design of new and improved roadways. <br />3. Ensure the future roadway network is C <br />financially feasible. <br />4. Coordinate the traffic circulation sys- PC <br />tem with other transportation modes such <br />as bus, taxi, bikeways and rail. <br />5. Provide for adequate flexibility in the PC <br />design of new street construction or <br />or improvements. <br />22 <br />- adopted 1985 Major Street <br />and Highway Program <br />- prepared traffic circulation <br />study <br />- adopted 20 Year Transport- <br />ation Capital Improvements <br />Program (TCIP) <br />- Construction of Indian River <br />Blvd and Lindsey Read <br />- adopted state safety <br />guidelines <br />- adopted 5 year and 20 <br />year Transportation Capital <br />Improvements Programs (TCIP) <br />- adopted calprehensive <br />bikeway and sidewalkplan <br />- follow adopted state design <br />and construction guidelines <br />for R -O -W protection <br />- The county has acquired <br />over 67.32 square acres <br />(based upon thoroughfare <br />plan and does not include <br />internal subdivision roads) <br />of RC1 since 1982 <br />