My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-050
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2022 10:09:09 AM
Creation date
4/6/2022 3:25:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
03/08/2022
Control Number
2022-050
Agenda Item Number
8.G.
Entity Name
All Webbs Enterprises, Inc.
Subject
Change Order No. 1, Well Field Feasibility Expansions Study
at the North County Water Treatment Plant,
Well N7 Formation Water Disposal Measures and Gopher Tortoise Management
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />No. 1 <br />PROJECT: North County Water Treatment Plant Well N7 Formation Water Disposal Measures and <br />Gopher Tortoise Management <br />DATE OF ISSUANCE March 2022 EFFECTIVE DATE March 2022 <br />OWNER Indian River County <br />OWNER's Contract No. Agreement Dated July 13, 2021 Project No. 044572103 <br />CONTRACTOR All Webbs Enterprises, Inc. ENGINEER Kimley-Horn and Associates <br />You are directed to make the following changes in the Contract Documents: <br />Description: Install 800 linear feet of silt fence and pipe ramps for gopher tortoise management; add <br />turbidity controls to formation water disposal to meet 0 NTU above background in G7 canal (in <br />accordance with IRFWCD Discharge permit No. 22-07). Modify configuration to blend discharge with raw <br />water, add settling tanks, add floc logs, furnish dissipation structure in canal (install by owner). Change <br />Order 1 includes an increase in contract price for Well N7 ($92,435) and a net reduction of the total <br />Contract Price for work not performed on Well S1 ($211,465). <br />Reason for change order: Meet discharge permit requirements for IRFWCD and FWC permit <br />requirements for gopher tortoise relocation. <br />Attachments: (List documents supporting change) <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIME <br />Original Contract Price <br />Original Contract Times <br />$ 992,100.00 <br />Substantial Completion: 270 (April 9, 2022) <br />Ready for final payment: 300 (May 9, 2022) <br />Days or dates <br />Net changes from previous Change Orders <br />Net change from previous Change Orders <br />$ N/A <br />N/A days <br />Contract Price prior to this Change Order <br />Contract Time prior to this Change Order <br />Substantial Completion: 270 <br />$ 992,100 <br />Ready for final payment: 300 <br />Days or dates <br />Net Increase (decrease) in this Change Order <br />Net Increase in this Change Order <br />$ (211,465) <br />118 <br />days <br />Contract Price with all approved Change Orders <br />Contract Time with all approved Change Orders <br />Substantial Completion: 388 <br />$ 780,635 <br />Ready for final payment: 418 <br />Days or dates,.••", <br />RECOMME ED: APPR D: ACCEPTED: �� �M!SS%p^✓F <br />9s �i <br />By: By: <br />Engineer ( uthorize4i Signature) Owner (Authorized Signature)Contractor (Authorized S�griature <br />Jill Grimaldi, Kimley-Horn and Associates Dave Webb, Jr. All Webbs, Inc. ; p� <br />Date: 2/24/2022 Date: April 5 , 2022 Date <br />EJCDC No. C-700 (2002 Edition) <br />PP -"1K'- ED- AS TO FORM <br />Prepared by the Engineers Joint Contract Documents Committeebri1 erdorjp4( U;hd so(i)i(ed G44il!Pr nlrAmerica <br />COUNTY A17ORNEY <br />R C�����f <br />Attest: Jeffrey R. Smit11;'Clerk of <br />Circuit Court and Comptroller <br />Deputy CW* <br />
The URL can be used to link to this page
Your browser does not support the video tag.