My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-052
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 12:49:10 PM
Creation date
4/7/2022 12:30:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2022
Control Number
2022-052
Agenda Item Number
8.F.
Entity Name
De La Hoz Builders, Inc.
Subject
Contract for Jackie Robinson Training Complex Ticket Office Building Renovations
Project Number
IRC-2020
Bid Number
2022026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
claimant within 30 days after receipt of the <br />claimant's last submittal (unless ENGINEER <br />allows additional time). <br />B. ENGINEER's Decision: ENGINEER will <br />render a formal decision in writing within 30 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. ENGINEER's <br />written decision on such Claim, dispute, or other <br />matter will be final and binding upon OWNER and <br />CONTRACTOR unless: <br />1. an appeal from ENGINEER's <br />decision is taken within the time limits and •n <br />accordance with the dispute resolution <br />procedures set forth in Article 16; or <br />2. if no such dispute resolution <br />procedures have been set forth in Article 16, a <br />written notice of intention to appeal from <br />ENGINEER's written decision is delivered by <br />OWNER or CONTRACTOR to the other and to <br />ENGINEER within 30 days after the date of <br />such decision, and a formal proceeding is <br />instituted by the appealing party in a forum of <br />competent jurisdiction within 60 days after the <br />date of such decision or within 60 days after <br />Substantial Completion, whichever is later <br />(unless otherwise agreed in writing by OWNER <br />and CONTRACTOR), to exercise such rights or <br />remedies as the appealing party may have w4h <br />respect to such Claim, dispute, or other matter <br />in accordance with applicable Laws and <br />Regulations. <br />C. If ENGINEER does not render a formal <br />decision in writing within the time stated in ;paragraph <br />10.05.13, a decision denying the Claim in its entirety <br />shall be deemed to have been issued 31 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any, <br />D. No Claim for an adjustment in Contract Price <br />or Contract Times (or Milestones) will be valid if not <br />submitted in accordance with this paragraph 10.05. <br />ARTICLE 11 - COST OF THE WORK; CASH <br />ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />A. Costs Included: The term Cost of the Work <br />means the sum of all costs necessarily incurred and <br />paid by CONTRACTOR in the proper performance of <br />the Work. When the value of any Work covered by a <br />Change Order or when a Claim for an adjustment in <br />Contract Price is determined on the basis of Cost of <br />the Work, the costs to be reimbursed to <br />CONTRACTOR will be only those additional or <br />incremental costs required because of the change in <br />the Work or because of the event giving rise to the <br />Claim. Except as otherwise may be agreed to in <br />writing by OWNER, such costs shall be in amounts no <br />higher than those prevailing in the locality of the <br />Project, shall include only the following items, and <br />shall not include any of the costs itemized in para- <br />graph 11.01.6. <br />2. Cost of all materials and equipment <br />furnished and incorporated in the Work, includ- <br />ing costs of transportation and storage thereof, <br />and Suppliers' field services required in <br />connection therewith. All cash discounts shall <br />accrue to CONTRACTOR unless OWNER <br />deposits funds with CONTRACTOR with which <br />to make payments, in which case the cash <br />discounts shall accrue to OWNER. All trade <br />discounts, rebates and refunds and returns <br />from sale of surplus materials and equipment <br />shall accrue to OWNER, and CONTRACTOR <br />shall make provisions so that they may be <br />obtained. <br />3. Payments made by CONTRACTOR <br />to Subcontractors for Work performed by <br />Subcontractors. If required by OWNER, COW <br />TRACTOR shall obtain competitive bids from <br />subcontractors acceptable to OWNER and <br />CONTRACTOR and shall deliver such bids to <br />OWNER, who will then determine, with the <br />advice of ENGINEER, which bids, if any, will be <br />acceptable. If any subcontract provides that the <br />00700 - General Conditions <br />00700-31 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2020 JRTC Ticket Office P,enovations\1-Adorn\Bids\Bid Documents\Rebid\00700 - General Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.