Laserfiche WebLink
Subcontractor is to be paid on the basis of Cost <br />of the Work plus a fee, the Subcontractor's <br />Cost of the Work and fee shall be determined <br />in the same manner as CONTRACTOR's Cost <br />of the Work and fee as provided in this para- <br />graph 11.01. <br />4. Costs of special consultants <br />(including but not limited to engineers, <br />architects, testing laboratories, surveyors, <br />attorneys, and accountants) employed for <br />services specifically related to the Work. <br />5. Supplemental costs including the <br />following: <br />a. The proportion of necessary trans- <br />portation, travel, and subsistence expenses of <br />CONTRACTOR's employees incurred in dis- <br />charge of duties connected with the Work. <br />b. Cost, including transportation and <br />maintenance, of all materials, supplies, equip- <br />ment, machinery, appliances, office, and <br />temporary facilities at the Site, and hand tools <br />not owned by the workers, which are consumed <br />in the performance of the Work, and cost, less <br />market value, of such items used but not con- <br />sumed which remain the property of CON- <br />TRACTOR. <br />C. Rentals of all construction equip- <br />ment and machinery, and the parts thereof <br />whether rented from CONTRACTOR or others <br />in accordance with rental agreements approved <br />by OWNER with the advice of ENGINEER, and <br />the costs of transportation, loading, unloading, <br />assembly, dismantling, and removal thereof. <br />All such costs shall be in accordance with the <br />terms of said rental agreements. The rental of <br />any such equipment, machinery, or parts shall <br />cease when the use thereof is no longer <br />necessary for the Work. <br />d. Sales, consumer, use, and other <br />similar taxes related to the Work, and for which <br />CONTRACTOR is liable, imposed by Laws and <br />Regulations. <br />e . Deposits lost for causes other than <br />negligence of CONTRACTOR, any Sib - <br />contractor, or anyone directly or indirectly <br />employed by any of them or for whose acts any <br />of them may be liable, and royalty payments <br />and fees for permits and licenses. <br />f. Losses and damages (and related <br />expenses) caused by damage to the Work, not <br />compensated by insurance or otherwise, sus- <br />tained by CONTRACTOR in connection with <br />the performance of the Work (except losses <br />and damages within the deductible amounts of <br />property insurance established in accordance <br />with paragraph 5.06.D), provided such losses <br />and damages have resulted from causes other <br />than the negligence of CONTRACTOR, any <br />Subcontractor, or anyone directly or indirectly <br />employed by any of them or for whose acts any <br />of them may be liable. Such losses shall <br />include settlements made with the written <br />consent and approval of OWNER. No such <br />losses, damages, and expenses shall be <br />included in the Cost of the Work for the <br />purpose of determining CONTRACTOR's fee. <br />g. The cost of utilities, fuel, and sanitary <br />facilities at the Site. <br />h. Minor expenses such as telegrams, <br />long distance telephone calls, telephone service <br />at the Site, expressage, and similar petty cash <br />items in connection with the Work. <br />i. When the Cost of the Work is used to <br />determine the value of a Change Order or of a <br />Claim, the cost of premiums for additional <br />Bonds and insurance required because of the <br />changes in the Work or caused by the event <br />giving rise to the Claim. <br />j. When all the Work is performed on the <br />basis of cost-plus, the costs of premiums for all <br />Bonds and insurance CONTRACTOR is <br />required by the Contract Documents to <br />purchase and maintain. <br />B. Costs Excluded: The term Cost of the Work <br />shall not include any of the following items: <br />1. Payroll costs and other compensation <br />of CONTRACTOR's officers, executives, princi- <br />pals (of partnerships and sole proprietorships), <br />general managers, engineers, architects, <br />estimators, attorneys, auditors, accountants, <br />purchasing and contracting agents, expediters, <br />timekeepers, clerks, and other personnel <br />employed by CONTRACTOR, whether at the <br />Site or in CONTRACTOR's principal or branch <br />office for general administration of the Work <br />and not specifically included in the agreed upon <br />schedule of job classifications referred to in <br />paragraph 11.01.A.1 or specifically covered by <br />paragraph 11.01.A.4, all of which are to be <br />considered administrative costs covered by the <br />CONTRACTOR's fee. <br />00700 - General Conditions <br />00700-32 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2020 JRTC Ticket Office Renovations\1-Admin\Bids\Bid Documents\Rebid\00700 - General Conditions.doc <br />