My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-052
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 12:49:10 PM
Creation date
4/7/2022 12:30:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2022
Control Number
2022-052
Agenda Item Number
8.F.
Entity Name
De La Hoz Builders, Inc.
Subject
Contract for Jackie Robinson Training Complex Ticket Office Building Renovations
Project Number
IRC-2020
Bid Number
2022026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
chipped away down to sound concrete. The patching mortar shall <br />be pressed in for a complete bond and finished to match adjacent <br />areas, or where defective areas impair the strength of the member <br />in question, as judged by the Owner's representative, the member <br />shall be removed or united as determined by the Owner's <br />representative. <br />b. Minor defective areas, as judged by the Owner's representative <br />including honeycomb, air bubbles, holes resulting from removal of <br />ties, and those resulting from leakage of forms shall be patched <br />with grout without resorting to chipping. Minor bulges and offsets <br />at form joints shall be finished as specified herein below. <br />B. Uniform Surfaces — Flatwork: <br />1. General: Grade and screed the surfaces to the exact elevation, or slope shown or <br />required. Make proper allowances for setting beds for ceramic tile. After <br />screeding tamp mixture thoroughly to drive the coarse aggregate down from the <br />surfaces and apply the applicable finish specified hereinafter. Always slope <br />exterior walks away from the building at 1/8" per foot. Uncovered walks slope at <br />1/8" per foot or crown. Covered walks between buildings always slope to drain to <br />the exterior and away from the buildings. At cross intersections of the walks, and <br />at exterior doors, warp the surfaces to drain water from the walls. Provide control <br />joints as indicated on drawings. Follow the requirements and procedures of ACI <br />301. <br />2. Finishes - Definitions (See also ACI 301): <br />a. Scratched Finish: After concrete has been placed, struck off, <br />consolidated and leveled to a Class B tolerance, surface shall be <br />roughened with stiff brush, rates or metal lath roller, before final set. <br />b. Floated Finish: After concrete has been placed, struck off, <br />consolidated and leveled, concrete shall not be worked further until <br />water sheen has disappeared and/or when mix has stiffened <br />sufficiently to permit proper operations of a power driven float. <br />Consolidate with power driven float, check trueness of surface, fill <br />low spots and cut down high spots to achieve Class B tolerance. <br />Then, re -float to uniform, smooth, granular texture. <br />C. Troweled Finish: Finish same as above for floated finish and in <br />addition, steel trowel the surface by hand to produce a smooth, <br />glassy, impervious surface free of trowel marks to a Class A <br />tolerance. On surfaces intended to support floor coverings, defects of <br />sufficient magnitude to show through the floor covering shall be <br />removed by grinding. <br />03300-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.