My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1968-009
CBCC
>
Resolutions
>
1960's
>
1968
>
1968-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 11:00:17 AM
Creation date
4/22/2022 10:57:07 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1968-009
Approved Date
02/21/1968
Resolution Type
Adopting a Building Code
Subject
Adopting Building Code, Electrical & Plumbing Codes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contain the reasons therefor. <br />Section 20. CONDITION OF THE PERMIT. The Building Offi- <br />cial shall act upon an application for a permit with plans as filed, or <br />as amended, without unreasonable or unnecessary delay. A permit <br />issued shall be construed to be a license to proceed with the work and <br />shall not be construed as authority to violate, cancel, alter, or set <br />aside any of the provisions of this code, nor shall s ucil issuance of <br />a permit prevent the Building Official from thereafter renuiring cor- <br />rection of errors In plans or in construction, or of violations of this <br />code. Any permit Issued shall become invalid unless the work author- <br />ized by It shall have been commenced within six (6) months after its <br />issuance, or If the work authorized by such permit is suspended or <br />abandoned for a period of one year after the time the work is com- <br />menced; provided, that for cause, one or more extensions of time <br />for periods not oxceeding ninety (90) days each, may be allowed In <br />writing by the Building Official, <br />Section 21. SCHEDULE OF FEES. <br />(1) No permit shall be valid until the fees prescribed in this <br />section shall have been paid-, nor shall an amendment to a permit be <br />approved until the additional fees, It any, shall have been paid. <br />(2) If any person commences any work on an electrical instal- <br />lation before obtaining the necessary permit, lie shall be subject to <br />the penalty prescribed herein. <br />(3) When application for permit is approved and before a per- <br />mit Is Issued, a fee therefor shall be paid based on the following <br />schedule of rates: <br />LIGHT OUTLETS <br />I to 8 outlets, inclusive - minimum $ 3.00 <br />Over 8 outlets, the minimum charge of <br />$3.00 for the first 8 outlets Plus - <br />each additional outlet .10 <br />SERVICES <br />Temporary for construction 2.50 <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.