Laserfiche WebLink
7. Open Space: Required: 40.0% <br />Provided: 44.4% <br />The= following i.& a detailed break -dawn of_ open spa_ae proposed <br />in the submitted PD plan: <br />Total Site Area: 68.82 acres <br />Total Open Space Required: 27.53 acres (40% of 68.82 <br />acres) <br />Total Open Space Provided: 30.53 acres (not including <br />creditable private exterior <br />impervious open area) <br />Break -down of Open Space Provided: <br />• Lake Area (creditable amount limited <br />to 30% of 27.53 acres of required <br />open space): 8.26 acres <br />• Passive Recreation Area: 0.86 acres <br />• Active Recreation Area (entire tract, <br />including facilities, are creditable): 1.73 acres <br />• Sidewalk Area (7,000 lineal feet <br />X 4' width): 0.64 acres <br />• Lake Bank Area (green area above <br />water control elevation): 1.92 acres <br />• Green Open Space on Private Lots (40% <br />of lot area on all 206 lots): 17.12_ acres <br />30053 acres <br />The 30.53 acre figure is conservative. Developed l-ots will <br />normally contain more than 40% open space as demonstrated on <br />- attachment #8. Furthermore, the 30.53 acre figure does not <br />include any credit, as allowed under the PD LDRs, for <br />privately owned exterior impervious area (pools, patios, <br />decks, walkways). <br />8. Required Recreational Area: 2.47 acres required for 206 <br />lots <br />Provided Recreational Area: 2.59 acres (1.73 acres, active <br />recreation, .86 acres passive <br />recreation) <br />9. Phasing: The project is proposed to be constructed in 4 <br />phases (see attachment #4), as follows: <br />Phase 1: 65 lots, western lake, entrance road and portion of <br />internal roadways, 1.73 acre active recreation <br />tract, 1 passive recreation tract. <br />Phase 2: 35 lots, north/south road and portion of internal <br />roadways, 1 passive recreation tract. <br />Phase 3: 56 lots, eastern lake, portion of internal <br />roadways, 2 passive recreation tracts. <br />Phase 4: 50 lots, and final portion of internal roadways. <br />Each phase will include the perimeter buffering improvements <br />and sidewalk improvements required for that phase. <br />10. Environmental: <br />*Uplands: The project is greater than 5 acres; therefore, it <br />is subject to the provisions of Section 929.05 of the county's <br />Land Development Regulations (LDRs). Environmental planning <br />staff has determined that the site has been significantly <br />disturbed and that no native upland vegetative community <br />currently exists on the site. For that reason, no upland area <br />preservation requirements apply to the development. <br />*Wetlands: Approximately 3.1 acres of isolated wetlands have <br />been identified by the St. Johns River Water Management <br />District (SJRWMD) on the 68.82 acre site. Development of the <br />SEPTEMBER 26, 1995 19 soot 96 PA.r,E 22 <br />