Laserfiche WebLink
8009 96 4GF 79 <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Bird, the Board by a 4-0 vote <br />(Commissioner Eggert being absent) authorized <br />negotiations with the first ranked firm, Camp <br />Dresser and McKee, Inc., as set out in staff's <br />recommendation. <br />DEVELOPER'S AGREEMENT FOR WATER MAIN EXTENSIONS FOR <br />STERLING HOUSE ASSISTED LIVING FACILITY <br />The Board reviewed the following memo dated 9/26/95: <br />DATE: SEPTEMBER 26, 1995 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINT <br />DIRECTOR OF UTIL SERVICES <br />PREPARED WILLIAM F. N <br />AND STAFFED CAPITAL P CTS ENGINEER <br />BY: DEPAR UTILITY SERVICES <br />SUBJECT: DEVELOPER'S AGREEMENT WITH EDGAR L. SCHLITT FOR <br />MASTER PLANNED AND NON MASTER PLANNED WATER MAIN EXTENSIONS <br />FOR STERLING HOUSE ASSISTED LIVING FACILITY <br />The proposed agreement is for the construction of 500 linear feet ± <br />of 16" master .planned water main on' Indian River Drive and an 8" looping <br />transmission main into Vista Gardens (See Exhibit A of the attached <br />Developer's Agreement). In conjunction with this Agreement and as a result <br />of an ongoing D.O.T. project at 4th Street and U.S. 1 our Department of <br />Transportation (D.O.T.) permit requires the immediate construction of 265 <br />linear feet of 16" water main on Indian River Drive. (See letter dated <br />August 24, 1995). To accomplish this, we have utilized plans generated by <br />Schlitt's engineer, Carter Associates, Inc., to negotiate a price with the <br />D.O.T.'s utility contractor Derrico Construction for this part of the water <br />main construction. (See attached proposal from Derrico). This work will be <br />removed from the Schlitt Agreement. <br />ANALYSIS I <br />The total project construction cost is estimated at $170,619 with the <br />developers portion at $7,956.68. (See exhibits B and C of the Agreement). <br />The immediate 16" water main construction cost from Derrico is in line with <br />other current project costs and is master planned. The 8" water main will <br />provide a much needed second water connection to Vista Gardens. The <br />Utilities Department is therefore seeking approval of not only the <br />Developer's Agreement, but also the contract with Derrico for the required <br />immediate construction. Funding for this project will be from the Utilities <br />Impact Fee fund. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval of the <br />proposed Developer's Agreement and authorization for staff to issue a <br />purchase order for the Derrico proposal as presented. <br />30 <br />OCTOBER 3, 1995 <br />