My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/17/1995
CBCC
>
Meetings
>
1990's
>
1995
>
10/17/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:13 PM
Creation date
6/16/2015 3:04:22 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/17/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bm 96 PhIF"3S9 <br />ANALYSIS <br />This project will provide water to the_properties on the south side of SR 60, <br />as well as to complete a loop in our overall water system on SR 60. (See <br />attached overall map.) The preliminary estimated project cost, which <br />includes in-house engineering, permitting, project administration, and <br />inspection is $112,330.00. Funding will be from the Utilities impact fee <br />fund (WIP 472-000-169-275.00). <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval of the <br />project scope as described above and as shown on the attached map. <br />PRELIMINARY ESTIMATION PROJECT COST <br />STATE ROAD 60 FROM 62 DRIVE TO 66AVENUE WATERMAIN <br />INDIAN RIVER COUNTY PROJECT # UW -95 -DS <br />ITEM <br />ESTIMATED <br />UNIT <br />SUBTOTAL <br />QUANTITY / UNIT <br />PRICE <br />M <br />W <br />MOBILIZATION <br />1.00 L.S <br />3,000.00 <br />3,000.00 <br />VIDEO RECORD <br />1.00 L.S <br />400.00 <br />400.00 <br />TRENCH SAFETY <br />1.00 L.S <br />4,000.00 <br />4,000.00 <br />12" DIP WM <br />2,300.00 L. F <br />25.00 <br />57, 500.00 <br />12" G.V. <br />5.00 UNIT <br />1,500.00 <br />7,500.00 <br />8" G.V. W/ PLUG <br />2.00 UNIT <br />750.00 <br />1,500.00 <br />FHA <br />4.00 UNIT <br />2,000.00 <br />8,000.00 <br />CONCRETE ENCASEMENT <br />1.00 L.S <br />2,000.00 <br />2,000.00 <br />R/W CUT RESTORATION <br />100.00 L.F <br />20.00 <br />2,000.00 <br />TRAFFIC CONTROL <br />1.00 L.S <br />5,000.00 <br />5,000.00 <br />SEED & MULCH <br />2,300.00 L.F <br />0.40 <br />920.00 <br />ACAD AS -BUILT <br />1.00 L.S <br />2,000.00 <br />2,000.00 <br />SUB -TOTAL PROJECT COST <br />93,820.00 <br />CONSTRUCTION CONTINGENCY <br />9,382.00 <br />TOTAL CONSTRUCTION COST <br />103,202.00 <br />DESIGN & CONSTRUCTION ADMINISTRATION <br />9,128.OQ <br />INSPECTION, PERMITTING ETC <br />TOTAL PROJECT COST <br />$112,330.00 <br />65 <br />OCTOBER 17, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.