Laserfiche WebLink
COMPANY <br />TOTAL BID <br />Timothy Rose Contracting, Inc., Vero Beach, FL <br />$3,806,470.75 <br />Ranger Construction Industries, Inc., Fort Pierce, FL <br />$4,279,114.45 <br />Dickerson Florida, Inc., Fort Pierce, FL <br />$4,441,628.25 <br />MJC Land Development, LLC, Royal Palm Beach, FL <br />$4,566,833.50 <br />C. W. Roberts Contracting, Inc., Palm City, FL <br />$4,837,365.80 <br />Timothy Rose Contracting, Inc. is considered to <br />project with a bid totaling $3,806,470.75. The <br />Estimate. Timothy Rose Contracting, Inc. has <br />satisfactory manner. <br />FUNDING <br />oe the lowest, responsive, responsible bidder for the <br />bid is $485,579.75 (14.62%) above the Engineer's Cost <br />completed various projects within the County in a <br />Per the SCOP grant agreement, the County must fund the project and then request reimbursement of the <br />grant share from MOT to a maximum amount of $1,128,607 or 75% of the total cost for the project. <br />Current funding for the project in the amount of $2,500,000 is available in the Capital Improvement <br />Element (CIE) through Secondary Roads/69th St Resurfacing 66th Ave to US 1, Account No. 10921441- <br />053360-19003 for $2,000,000 and Traffic Impact Fees 2020/ District 1/69th Street Resurfacing 66th <br />Avenue to U.S. 1 for $500,000. The roadway share for the County will be $2,984,210.75 and the Utility <br />Watermain installation share will be in the amount of $822,260.00, for a total project cost of $3,806,471. <br />The additional County funding needed in the amount $484,211 will be programmed into the 22/23 CIE <br />using Traffic Impact Fees 2020. The additional funding necessary for the Utility share of the project will be <br />allocated in the Utility Account Number 471-169000-22501. <br />Account Name <br />Account Number <br />Amount <br />Traffic Impact Fees 2020 — District 1/69th Street <br />1 0415141-066510-19003 <br />$984,211 <br />Resurfacing (66th Ave to US 1) <br />Secondary Roads/69th Street Resurfacing (66tH <br />Ave to US 1) <br />10921441-053360-19003 <br />$2,000,000 <br />Utilities/WIP/691h Street WM — 58th Ave <br />471-169000-22501 <br />$822,260 <br />69 <br />