My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/22/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
06/22/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 1:33:06 PM
Creation date
5/31/2022 12:20:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/22/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K mley>>)Horn <br />MEMORANDUM <br />Himanshu Mehta, PE <br />To: IRC SWDD <br />From: Jill Grimaldi, BCES <br />Kimley-Horn and Associates, Inc. <br />Date: June 11. 2021 <br />Subject: Centrate Tank Refurbishing by Crom <br />As the Solid Waste Disposal District evaluates options for the treatment and disposal of the leachate <br />generated by the County's landfill, the existing centrate tank associated with the biosolids dewatering <br />facility is in the process of being repurposed for leachate storage. <br />To be able to properly store the leachate, the existing centrate tank requires an interior coating that is <br />designed and rated to withstand the corrosive environment created by the leachate. The existing <br />interior coating does not meet those requirements. Kimley-Horn has engaged the original tank <br />manufacturer, Crom Corporation, to determine what process is required to recoat the tank walls and <br />bottom, while preserving the tank's integrity and any remaining warranty items per Crom's <br />specifications. <br />In addition, the tank will require the addition of a mixing mechanism to keep the leachate mixed <br />during storage. The potential mixing options currently under evaluation include jet pump mixers that <br />require cores to be drilled in the walls of the tank. It is imperative that this work be performed by the <br />tank manufacturer to reduce the risk of damaging the prestressing rings that span the circumference <br />of the tank. Crom routinely performs such core drillings on their pre -stressed tanks for various <br />applications and it would not be advisable to allow a separate contractor to complete such work. <br />It is for that reason that we recommend that SWDD proceed with a sole -source contract to Crom for <br />the recoating and installation of the mixer (to De direct purchased by the County upon completion of <br />the mixing evaluation). <br />Attached is Crom Corporation's propcsal for the cleaning of the tank, removal of the existing coating, <br />visual inspection of the tank interior and exterior for cracks and overall condition and application of <br />the specified coating for leachate storage. Options were included within this proposal for the coating <br />of the underside of the dome (if warranted by the selected mixer design), coating of the interior piping <br />to provide additional corrosion protection, an-- for up to four (4) wall penetrations to accommodate the <br />mixer and fill line modifications. If the mixer ti -at is ultimately selected does not require the dome <br />coating or wall penetrations, a deductive change order could be issued to recoup that budget from <br />Crom. <br />
The URL can be used to link to this page
Your browser does not support the video tag.