Laserfiche WebLink
Kimley»>Horn <br />The proposal is summarized below and attaches in full for your information. <br />1. Base Services $140,750 <br />Mobilization $ 2,000 <br />Tank Inspection $ 3,500 <br />Surface Preparation $ 48,000 <br />Resurfacing $ 37,750 <br />Coatings Application $ 49,000 <br />Disinfection $ 500 <br />2. Option 1: Interior Dome Coating $56,525 <br />Surface Preparation $20,300 <br />Resurfacing $16,000 <br />Coatings Application $20,225 <br />3. Option 2: Interior Piping $5,425 <br />Surface Preparation $ 2,520 <br />Coatings Application $ 2,905 <br />4. Option 3: Wall Penetrations $50,000 <br />Four 8 -inch Stainless Steel <br />Wall Pipes (ea) $12,500 <br />Page 2 <br />The total (not -to -exceed) potential contract value, including all three options, is $252,700. Should the <br />County opt not to proceed with one or more options, Crom will deduct the value of the option(s) from <br />the total pay application. The cost of the selected mixer and the mixer installation is not included. It is <br />anticipated that the County will direct -purchase the selected piece of equipment. Installation of the <br />mixer will be provided under separate authorization or amendment. <br />