My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/05/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
10/05/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 2:30:46 PM
Creation date
5/31/2022 2:11:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/05/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Magnolia Court at Waterway Village PD (Pods H,I,J) <br />FINAL LIFT BOND - OPC 9/15/2021 <br />TOTAL $ 111,704.60 <br />PROPOSED BOND AMCUNT (125%) $ 139,630.75 <br />� 111!ii/!i <br />Kimley HQrin'a ocjates!fgt . <br />FPS..... r11.Us <br />_ <br />Kfnarl,HUsainy, P.:�X - <br />FLR%#75481 w <br />rt TAT OF <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Enginee- cannot and does not guarantee that proposals, <br />bids, or actual construction costs will not vary from its opinions of probable costs. <br />IlRC ENGmEERI fill <br />blvis ON —7 21( <br />Accepted <br />'nsuffic e------- <br />PAVING <br />DESCRIPTION <br />QUANTITY UNIT <br />UNIT COST <br />TOTAL <br />1" ASPHALT (FINAL COURSE) - Pods H, IJ <br />9,070 SY <br />$ <br />9.78 <br />$ <br />88,704.60 <br />STRIPING <br />1 LS <br />$ <br />7,000.00 <br />$ <br />7,000.00 <br />SET PRM'S, PCP'S, LOT CORNERS <br />1 LS <br />$ <br />10,000.00 <br />$ <br />10,000.00 <br />SIDEWALK AT ROADWAY STUBS <br />2 EA <br />$ <br />3,000.00 <br />$ <br />6,000.00 <br />TOTAL <br />1 <br />$ <br />111,704.60 <br />TOTAL $ 111,704.60 <br />PROPOSED BOND AMCUNT (125%) $ 139,630.75 <br />� 111!ii/!i <br />Kimley HQrin'a ocjates!fgt . <br />FPS..... r11.Us <br />_ <br />Kfnarl,HUsainy, P.:�X - <br />FLR%#75481 w <br />rt TAT OF <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive <br />bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only <br />the Engineer's judgment as a design professional familiar with the construction industry. The Enginee- cannot and does not guarantee that proposals, <br />bids, or actual construction costs will not vary from its opinions of probable costs. <br />IlRC ENGmEERI fill <br />blvis ON —7 21( <br />Accepted <br />'nsuffic e------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.