Laserfiche WebLink
Division 1— General Requirements, IRC -1639 <br />P. ENGINEER will review and process all submittals promptly, but a reasonable time <br />should be allowed for this, for the Shop Drawings being revised and resubmitted, <br />and for time required to return the approved Shop Drawings to CONTRACTOR. <br />Q. Furnish required submittals with complete information and accuracy in order to <br />achieve required approval of an item within three submittals. All costs to <br />ENGINEER involved with subsequent submittals of Shop Drawings, Samples or <br />other items requiring approval, will be back -charged to CONTRACTOR in <br />accordance with the General Conditions and the Supplementary Conditions. If the <br />CONTRACTOR requests a substitution for a previously approved item, all of <br />ENGINEER'S costs in the reviewing and approval of the substitution will be back - <br />charged to CONTRACTOR unless the need for such substitution is beyond the <br />control of CONTRACTOR. <br />++ END OF SECTION ++ <br />Submittal of Shop Drawings - 01340-6 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\t-Admin\Bids\Bid Documents - Advertisement\DIV <br />1 GENERAL REQUIREMENTS - 20211207.docx <br />