My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-082
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:30:26 PM
Creation date
6/8/2022 3:08:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/03/2022
Control Number
2022-082
Agenda Item Number
8.G.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for Resurfacing 69th Street from 66th Avenue to SR5/US-1
FM No.438073-1-54-01
Project Number
IRC 1639
Bid Number
2022-028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1— General Requirements, IRC -1639 <br />B. Do not store or park materials or equipment within the drip line of trees that are to <br />remain. <br />C. Install temporary fences or barricades to protect trees and plants in areas subject to <br />traffic. <br />D. Fires shall not be permitted under or adjacent to trees and plants. <br />E. Within the limits of the Work, water trees and plants that are to remain, in order to <br />maintain their health during construction operations. <br />F. Cover all exposed roots with burlap and keep it continuously wet. Cover all exposed roots <br />with earth as soon as possible. Protect root systems from mechanical damage and <br />damage by erosion, flooding, run-off or noxious materials in solution. <br />G. If branches or trunks are damaged; prune branches immediately and protect the cut or <br />damaged areas with emulsified asphalt compounded specifically for horticultural use. <br />H. Remove all damaged trees and plants that die or suffer permanent injury and replace <br />them with a specimen of equal or better quality. <br />I. Coordinate Work in this Section with requirements of other sections herein. <br />1.4 PROTECTION OF IRRIGATION <br />The CONTRACTOR shall be responsible for maintaining in good condition all irrigation systems <br />within the easements, which could be damaged by construction activities. The CONTRACTOR <br />shall repair any irrigation systems damaged by construction activities within two (2) days. <br />Irrigation systems partially within the right-of-way and all intersecting side streets within project <br />limits may be cut off and capped or connected to same system to maintain functionality. The <br />CONTRACTOR shall be responsible for maintaining the functionality of the remaining portion of <br />the system if it should fall outside of the right-of-way. <br />1.5 PROTECTION OF EXISTING STRUCTURES <br />A. Underground Structures: <br />1. Underground structures are defined to include, but not be limited to, all sewer, <br />water, gas, and other piping, and manholes, chambers, electrical conduits, tunnels <br />and other existing subsurface work located within or adjacent to the limits of the <br />Work. <br />2. All underground structures known to ENGINEER except service connections for <br />water, sewer, electric, and telephone are shown. This information is shown for the <br />assistance of CONTRACTOR in accordance with the best information available, but <br />is not guaranteed to be correct or complete. The existing utilities shown on the <br />Contract Drawings are located according to the information available to the <br />ENGINEER at the time the Drawings were prepared and have not been <br />Protection of the Work and Property - 01541-2 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />1 GENERAL REQUIREMENTS - 20211207.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.