My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-082
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:30:26 PM
Creation date
6/8/2022 3:08:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/03/2022
Control Number
2022-082
Agenda Item Number
8.G.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for Resurfacing 69th Street from 66th Avenue to SR5/US-1
FM No.438073-1-54-01
Project Number
IRC 1639
Bid Number
2022-028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1—General Requirements, IRC -1639 <br />independently verified by the OWNER or the ENGINEER. Guarantee is not made that <br />all existing underground utilities are shown or that the locations of those shown are <br />accurate. The locations shown are for bidding purposes only. Finding the actual <br />location of any existing utilities is the CONTRACTOR's responsibility and shall be <br />done before it commences any work in the vicinity. Furthermore, the CONTRACTOR <br />shall be fully responsible for any and all damages, which might be occasioned by the <br />CONTRACTOR's failure to exactly locate and preserve any and all underground <br />utilities. The OWNER or ENGINEER will assume no liability for any damages <br />sustained or costs incurred because of the CONTRACTOR's operations in the vicinity <br />of existing utilities or structures, nor for temporary bracing and shoring of same. If <br />it is necessary to shore, brace, or swing a utility, contact the utility company or <br />department affected and obtain their permission regarding the method to use for <br />such work. <br />3. Contact the various utility companies which may have buried or aerial utilities <br />within or near the construction area before commencing work. Provide 48 hours <br />minimum notice to all utility companies prior to beginning construction. <br />4. Schedule and execute all work involving existing utilities in order to minimize <br />necessary interruption of services. Whenever such interruption is necessary for <br />completion of the work, notify the ENGINEER and the appropriate utility at least 48 <br />hours in advance. Perform all work to repair/restore utility service to the <br />satisfaction of the appropriate utility. Include all costs related to service <br />maintenance, interruption, and restoration in the appropriate line item in the <br />Contract. <br />5. Where it is necessary to temporarily interrupt house or business services, the <br />CONTRACTOR shall notify the owner or occupant, both before the interruption (24- <br />hour minimum), and again immediately before service is resumed. Before <br />disconnecting and pipes or cables, the CONTRACTOR shall obtain permission from <br />their owner, or shall make suitable arrangement for their disconnection by their <br />owner. <br />6. Explore ahead of trenching and excavation work and uncover all obstructing <br />underground structures sufficiently to determine their location, to prevent damage <br />to them and to prevent interruption of the services which such structures provide. <br />If CONTRACTOR damages an underground structure, restore it to original condition <br />at CONTRACTOR's expense. <br />7. Necessary changes in the location of the Work may be made by ENGINEER, to avoid <br />unanticipated underground structures. <br />8. If permanent relocation of an underground structure or other subsurface facility is <br />required and is not otherwise provided for in the Contract Documents, ENGINEER <br />will direct CONTRACTOR in writing to perform the Work, which shall be paid for <br />under the provisions of Article 11 of the General Conditions. <br />Protection of the Work and Property - 01541-3 <br />F:\PublicWorksNENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />1 GENERAL REQUIREMENTS - 20211207.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.