Laserfiche WebLink
Division 1—General Requirements, IRC -1639 <br />H. When finished surfaces require cleaning with cleaning materials, use only those <br />cleaning materials which will not create hazards to health or property and which <br />will not damage the surfaces. Use cleaning materials only on those surfaces <br />recommended by the manufacturer. Follow the manufacturer's directions and <br />recommendations at all times. <br />Keep the amount of dust produced during construction activities to a minimum. <br />At CONTRACTOR's expense, spray water or other dust control agents over the <br />areas, which are producing the dust. Schedule construction operations so that <br />dust and other contaminants will not fall on wet or newly coated surfaces. <br />1.3 SITE CLEANUP AND RESTORATION <br />Prior to final completion, the OWNER, ENGINEER, and CONTRACTOR shall review the site <br />with regards to site cleanup and restoration. Clean and/or restore all items determined <br />to be unsatisfactory by the OWNER or ENGINEER, at no additional expense. <br />++ END OF SECTION ++ <br />Site Cleanup and Restoration - 01710-2 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />1 GENERAL REQUIREMENTS - 20211207.docx <br />