Laserfiche WebLink
Division 2 - Technical Provisions, IRC -1639 <br />will be required with the initial application being fertilizer and the second application being <br />"weed and feed". <br />C. Guarantee: All sodded areas shall be guaranteed for one year after date of final <br />acceptance. <br />Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a square) <br />indication of probable non survival or lack of health and vigor, or which do not exhibit the <br />characteristics to meet specifications, shall be replaced within two weeks of notice from <br />Owner or Engineer. All replacement sod shall be furnished/installed at no additional cost to <br />the Owner and shall be guaranteed for three months. All replacement shall meet original <br />specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br />guarantee period and such guarantee shall be extended until notification is received. <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory growth shall be <br />replaced within two weeks. <br />D. Fertilizer: Commercial fertilizers shall comply with the Indian River County Fertilizer <br />Ordinance 2013-012 and Supplement Ordinance 2013-014 (see Appendix B). <br />E. Water for Grassing: Contractor shall provide the water used in the sodding operations as <br />necessary to meet the requirements of Article 570-3.6. <br />F. Preparation of Ground: The area over which the sod is to be placed shall be scarified or <br />loosened to a depth and then raked smooth and free from debris. Where the soil is <br />sufficiently loose and clean, the Owner, at his discretion, may authorize the elimination of <br />ground preparation. <br />G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a range of <br />6.0-7.0. <br />Contractor shall apply two (2) applications. The initial shall be fertilizer and the second <br />application shall be "weed and feed". <br />The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds per <br />acre, or 10 pounds per 1,000 square feet, by a spreading device capable of uniformly <br />distributing the material at the specified rate. <br />Contractor shall apply applications as per manufacturer's specification. All tickets from bags <br />shall be handed over to the County Inspector. <br />On steep slopes, where the use of a machine for spreading or mixing is not practicable, the <br />fertilizer shall be spread by hand and raked in and thoroughly mixed with the soil to a depth <br />of approximately 2 inches. <br />H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close contact <br />and shall be firmly and smoothly embedded by light tamping with appropriate tools. <br />Where sodding is used in drainage ditches, the setting of the pieces shall be staggered so as <br />Division 2 — Technical Provisions - 01025-26 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\t-Admin\Bids\Bid Documents - Advertisement\DIV <br />2 TECHNICAL PROVISIONS - IRC-1639.docx <br />