My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-082
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:30:26 PM
Creation date
6/8/2022 3:08:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/03/2022
Control Number
2022-082
Agenda Item Number
8.G.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for Resurfacing 69th Street from 66th Avenue to SR5/US-1
FM No.438073-1-54-01
Project Number
IRC 1639
Bid Number
2022-028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 2 - Technical Provisions, IRC -1639 <br />to avoid a continuous seam along the line of flow. Along the edges of such staggered areas, <br />the offsets of individual strips shall not exceed 6 inches. In order to prevent erosion caused <br />by vertical edges at the outer limits, the outer pieces of sod shall be tamped so as to produce <br />a featheredge effect. <br />Where sodding is placed abutting paved shoulder, the contractor is to ensure that the <br />finished sod elevation is 1%" below paved shoulder. <br />On slopes greater than 3:1, the Contractor shall prevent the sod from sliding by means of <br />wooden pegs driven through the sod blocks into firm earth, at suitable intervals. <br />Sodding shall not be performed when weather and soil conditions are, in the Engineer's <br />opinion, unsuitable for proper results. <br />Sod shall be placed around all structures, equipment pads, etc. <br />Watering: The areas on which the sod is to be placed shall contain sufficient moisture, as <br />determined by the Engineer, for optimum results. After being placed, the sod shall be kept <br />in a moist condition to the full depth of the rooting zone for at least 2 weeks. Thereafter, the <br />Contractor shall apply water as needed until the sod roots and starts to grow for a minimum <br />of 60 days (or until final acceptance, whichever is latest). <br />J. Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a <br />satisfactory condition until final acceptance of the project. Such maintenance shall include <br />repairing of any damaged areas and replacing areas in which the establishment of the grass <br />stand does not appear to be developing satisfactorily. <br />Replanting or repair necessary due to the Contractor's negligence, carelessness or failure to <br />provide routine maintenance shall be at the Contractor's expense. <br />The Contractor shall maintain the sodded area up to the final acceptance date as directed by <br />the Engineer. Grass height shall not exceed 6" without mowing. Clippings shall be removed <br />from sidewalk. <br />K. Article 570-9. The first two paragraphs under this Article are deleted and the following <br />is added: <br />The contract unit price for performance turf shall include the costs of sod, fertilizer (2 <br />applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, <br />water, tools, equipment, labor and all other incidentals necessary. <br />Item of Pavment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 570-1-1— Performance Turf (Sod) (Bahia) - Per Square Yard <br />Division 2 —Technical Provisions - 01025-27 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />2 TECHNICAL PROVISIONS - IRC-1639.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.