My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-082
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:30:26 PM
Creation date
6/8/2022 3:08:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/03/2022
Control Number
2022-082
Agenda Item Number
8.G.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for Resurfacing 69th Street from 66th Avenue to SR5/US-1
FM No.438073-1-54-01
Project Number
IRC 1639
Bid Number
2022-028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 7 <br />• Brian Good stated that at the horizontal direction drill under the canal, there is a footnote <br />that the Contractor is to locate all existing utilities prior to the work being performed and <br />the cost of the locates, including soft -digs, shall be included in the cost for the directional <br />drill activity. <br />• A question was asked about the demolition of pipe, concrete, and asphalt and the item <br />associated with that activity. Brian Good stated those activities are to be included in <br />Clearing and Grubbing, <br />• A question was asked about pipe crossing detail M-2 and how it wasn't included in the <br />plans. Brian Good stated that detail will be sent out in an addendum. He stated the pipe <br />should be installed first and per detail M-2. Tim Rose and Zach Rose questioned the order <br />in which the work is to take place when installing drainage and James Ennis stated for <br />clarification that the roadway can be broken, the drainage or utility installed, the trench <br />be restored per detail M-2 and the FDR process be performed throughout. If the <br />Contractor chose to perform the drainage work first, the trench would need to be restored <br />per detail M-2 and it would include temporary asphalt. <br />• Mark Winslow (Indian River County Engineering) stated that all addendums will need to be <br />acknowledged in the bids. <br />• James Ennis stated that after the meeting, all questions need to be directed to the <br />Purchasing Division and no other County staff should be called for questions. The deadline <br />for questions is Wednesday, March 23, 2022, 2:OOPM. The project is anticipated to be <br />awarded during the first BCC meeting in May and the anticipated Notice to Proceed is the <br />first week of June. Kirstin leiendecker stated the AutoCAD drawings will be included as <br />part of the addendum. <br />• Meeting adjourned. <br />Arrerwm- <br />Sign-In Sheet <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1- <br />Admin\Meetings\PreBid\IRC-1639_PREBID_MIN_ 20220316.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.