My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-094
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 11:57:15 AM
Creation date
6/16/2022 11:56:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
05/17/2022
Control Number
2022-094
Agenda Item Number
8.J.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment No. 2 to Work Order No. 27 for Dick Bird Pickleball Complex
Bid Number
IRC-2204
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment No. 2 — Dick <br />Bird Park <br />this task, ENGINEER will review the information provided by the sub -consultant and bring the <br />CAD linework from the sub -consultant into the ENGINEER's existing conditions base file. <br />Task 2 — Preparation of Modified Site Plan and Civil Plans <br />The ENGINEER understands that the COUNTY desires to modify the proposed site plan to <br />incorporate the removal and replacement of the existing tennis courts directly south of the <br />proposed pickleball courts. This task consists of the effort to address the COUNTY comments <br />dated 4/12/22 for the modified plan (with the exception of providing a lighting/photometrics <br />plan and technical specifications). Effort to address the comments outside of the modified plan <br />will be provided under the previous workorder. <br />This task consists of the effort for the ENGINEER to prepare a modified Site Plan to submit for <br />review and approval to the COUNTY. The ENGINEER will update the Site Plan up to one (1) time <br />based on COUNTY comments. <br />Once the COUNTY has approved the modified Site Plan, the ENGINEER will modify the following <br />sheets: <br />• Erosion Control and Demolition Plan <br />• Paving and Grading Plan <br />• Utility Plan <br />• Detail Sheets <br />• Cross Sections <br />o One additional cross section (per IRC Engineering comment letter 4/12/22) <br />o Updates to three existing cross sections to reflect the Pickleball/Tennis Court <br />Design <br />This task does not include effort to make modifications to the Site Plan after the COUNTY has <br />agreed to the plan prepared as part of this task, these modifications can be provided as an <br />additional service. <br />All technical specifications will be provided on the plans, and no separate technical <br />specifications document will be provided. This task also consists of the effort to update the <br />plans up to one (1) time based on comments generated from Task 5. <br />This task consists of the preparation of an Opinion of Probable Cost (OPC) at the 90% plan <br />submittal. This task does not include any revisions to the OPC. <br />Task 3 — Permitting Assistance <br />This task consists of items requested by SJRWMD during the review of the Pickleball Only <br />Design Plan application for a modification to the existing Environmental Resource Permit. <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.