My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-094
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 11:57:15 AM
Creation date
6/16/2022 11:56:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
05/17/2022
Control Number
2022-094
Agenda Item Number
8.J.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment No. 2 to Work Order No. 27 for Dick Bird Pickleball Complex
Bid Number
IRC-2204
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment No. 2 — Dick <br />Bird Park <br />Originally, the task assumed that a simple letter modification would be required. However, <br />SJRWMD requested additional information noted below: <br />• Full Drainage Report <br />• ICPR4 Modeling <br />• Analyzation of LIDAR information <br />• Recovery Analysis for proposed Swale <br />• Design swale to provide treatment volume <br />• Drainage Basin Maps <br />• One cross section <br />This task consists of the effort for the ENGINEER to produce the items above requested by <br />SJRWMD and submit. This task also consists of the response to up to two (2) informal rounds of <br />comments from SJRWMD. <br />This task consists of the effort required to prepare applications and supporting documentation <br />for specific permit reviews anticipated for the proposed modifications. It is our understanding <br />that the modifications to the tennis courts will require SJRWMD and Indian River County (IRC) <br />Community Development Department approvals. ENGINEER will prepare applications and <br />supporting documentation for the following permit applications: <br />• Indian River County Administrative Approval Revision <br />• SJRWMD Letter Modification <br />Due to the nature of the work, ENGINEEER will respond to up to one (1) round of comments <br />from the permitting jurisdictions above as part of this task. <br />Task 4 — 90% Submittal/Review <br />ENGINEER will submit to the COUNTY 90% completed plans for COUNTY review. As part of this <br />task, ENGINEER will address up to one (1) round of comments from the COUNTY. Once <br />comments are addressed, the ENGINEER will provide the COUNTY with a 100% set of plans. <br />ENGINEER will produce FOR CONSTRUCTION plans stamped that the COUNTY could issue to the <br />Contractor. <br />EXHIBIT B — FEE SCHEDULE <br />The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br />pursuant to this Agreement fees inclusive of expenses in accordance with the following: <br />A. Professional Services Fee <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.