My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/12/2022 (2)
CBCC
>
Meetings
>
2020's
>
2022
>
04/12/2022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 10:28:51 AM
Creation date
6/17/2022 10:11:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/12/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13901 NW 118th Avenue <br />Miami, FL 33178 <br />Phone: 305-883-0055 <br />imorrisO- Aeveno.com <br />TO: Indian River County <br />CEI - CONSOR <br />ATTN: Kelly Cowqer, PE <br />53rd St Bridge Redesign - SOV <br />EXPIRA-10N DATE: <br />PROJECT NO.: IRC -1505 <br />LOCATION: 66th Ave <br />ITEM # DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />AMOUNT <br />Test piles <br />1.00 <br />LS <br />$55,542.00 <br />$55,542.0 <br />End Bent 1 piles <br />1.00 <br />LS <br />$141,450.00 <br />$141,450.0 <br />End Bent 2 piles <br />1.00 <br />LS <br />$141,450.00 <br />$141,450.00 <br />End Bent 1 sheeting <br />1.00 <br />LS <br />$153,750.00 <br />$153,750.0 <br />End Bent 2 sheeting <br />1.00 <br />LS <br />$153,750,001 <br />$153,750.00 <br />End Bent 1 cap <br />1.00 1 <br />LS <br />$99,630.00 <br />$99630.00 <br />End Bent 2 cap <br />1.00 <br />LS <br />$99,630.00 <br />$99,630.00 <br />Rip Rap <br />1.00 <br />LS <br />$104,550.00 <br />$104,550.00 <br />FSB Bride Deck Panels <br />1.00 <br />LS <br />$441,325.85 <br />$441,325.85 <br />Concrete Topping for FSB Decks <br />1.00 <br />LS <br />$129,150.00 <br />$129,150.00 <br />Approach slab 1 <br />1.00 <br />LS <br />$52,890.00 <br />$52,890.00 <br />Approach slab 2 <br />1.00 <br />LS <br />$52,890.001 <br />$52,890.00 <br />Traffic Barrier Walls <br />1.00 <br />LS <br />$14,760.00 <br />$14,760.00 <br />Shoulder Barrer Walls <br />1.00 <br />LS <br />$73,800.00 <br />$73,800.00 <br />Aluminum Railing <br />1.00 <br />LS <br />$6,150.00 <br />$6150.00 <br />Demolition of EAsting Bride <br />1.00 <br />LS <br />$147,000.00 <br />$147,0W0 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />en nn <br />Exhibit B - Page 1 <br />185 <br />Rev.3/14/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.