Laserfiche WebLink
The Year 1 Post -Construction monitoring event will take place during summer 2022. Raw data from field <br />operations will be submitted to the County and FDEP within 45 days and the monitoring report will be <br />submitted within 90 days of completion of the survey. <br />Tack 1 A - Cr)ct <br />The lump sum cost for this task is $110,020.97. <br />1B. Sea Turtle Monitoring <br />The Sector 3 2022 sea turtle monitoring will be managed and coordinated by APTIM, and conducted by <br />APTIM's approved subconsultant, Ecological Associates, Inc. (EAI). <br />Task 113: Scope of Work <br />APTIM will oversee the scope of work proposed by EAI and provide the necessary administrative coordination <br />to the County. The 2022 sea turtle monitoring effort along the approximate 3.7 mile shoreline (R-20 to R-40) <br />within the Sector 3 Project Area addresses permit -required post -construction sea turtle monitoring. The <br />monitoring will comply with all applicable conditions set forth in the regulatory permits and related <br />authorizations for the project. EAI has provided the enclosed proposal and cost breakdown for sea turtle <br />monitoring tasks, which are summarized as follows: <br />1. Mobilization <br />2. Project Management <br />3. Daily Sea Turtle Monitoring and Data Management <br />4. Nest Marking and Monitoring <br />5. Post -Construction Escarpment Surveys <br />6. Lighting Surveys <br />7. Reporting <br />Task 113: Deliverable <br />EAI will submit a nesting season summary report within 90 days of completion of all monitoring activities. <br />Additionally, an Excel spreadsheet summarizing all nesting activity and reproductive success will be prepared <br />and submitted electronically to Joint Coastal Permit (JCP) Compliance and Florida Fish and Wildlife <br />Conservation Commission (FWC). <br />Task 113: Schedule <br />The sea turtle monitoring will commence in March 2022. <br />Task 113: Cost <br />The lump sum cost for this task is $116,527.05. <br />2. Task 2: Phase 2— Immediate Post -Construction Environmental Monitoring (R-40 to R-55) <br />2A. Nearshore Hardbottom Biological Monitoring <br />The Sector 3 2022 nearshore hardbottom biological monitoring will be managed and conducted by APTIM, <br />and conducted by APTIM's approved subconsultant, Coastal Protection Engineering LLC (CPE). <br />134 <br />