Laserfiche WebLink
The nearshore hardbottom monitoring for this task shall include: <br />• Hardbottom edge mapping (R-40 to R-57) <br />• Monitoring permanent transects (R-40 to R-56) <br />Task 2A: Scope of Work <br />3) Hardbottom Edge Mapping: <br />APTIM shall map the position of the nearshore hardbottom edge for the Phase 2 Sector 3 project area, <br />from R-40 to R-57, including 2000 feet south (downdrift) of the project area, for a length of approximately <br />3.2 miles. The same methods described above in Task 1A will be conducted. <br />4) Monitoring Permanent Transects: <br />Phase 2 monitoring shall be conducted from R-40 to R-56 and will include sixteen (16) permanent <br />transects (9 biological and 7 sediment -only). The same methods described above in Task 1A will be <br />conducted. <br />It is anticipated that the effort to delineate the hardbottom edge and monitor the transects will take up <br />to eight (8) field days based on previous monitoring events. <br />The data will be compiled and incorporated into a GIS database and in situ data will be entered into an <br />Access database. Time to complete data entry, reduction, analyses, and report production is included in <br />the cost estimate to address the data management and reporting requirements for those 8 days of field <br />operations. <br />Task 2A: Deliverable <br />Deliverables will be prepared as described above in Task 1A and will be submitted concurrently with Task 1A <br />deliverables. <br />Task 2A: Schedule <br />The Immediate Post -Construction monitoring event will take place during summer 2022 concurrently with the <br />Year 1 Post -Construction monitoring event. Raw data from field operations will be submitted to the County <br />and FDEP within 45 days and the monitoring report will be submitted within 90 days of completion of the <br />survey. <br />Task 2A: Cost <br />The lump sum cost for this task is $70,308.55. <br />2B. Sea Turtle and Shorebird Monitoring <br />The Sector 3 2022 sea turtle and shorebird monitoring will be managed and coordinated by APTIM, and <br />conducted by APTIM's approved subconsultant, EAI. <br />Task 213: Scope of Work <br />APTIM will oversee the scope of work proposed by EAI and provide the necessary administrative coordination <br />to the County. The 2022 sea turtle and shorebird monitoring effort along the approximate 2.95 mile shoreline <br />135 <br />