My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/15/2022 (4)
CBCC
>
Meetings
>
2020's
>
2022
>
02/15/2022 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 12:32:17 PM
Creation date
6/20/2022 12:13:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/15/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Work Order Number 8 <br />Indian River County Department of Utility Services <br />South Oslo Rd Water Plant <br />Floridan Well S-1 Replacement <br />PROJECT UNDERSTANDING <br />During the deepening work planned for the existing well S-1, as part of the on- <br />going water supply study to collect water quality and well performance data, it <br />became apparent that the existing well was failing and taking in too much sand <br />during the deepening process. Work was stopped to video the well and <br />determined that the casing cementing had failed and needed to be abandoned. <br />Replacement of well S-1 with a new well (S -1R) was recommended along with <br />plugging & abandoning the existing one. <br />The following scope of work is proposed to provide documents and construction <br />oversight for the replacement of well S-1, consisting of preparation of design <br />documents, FDEP and SJRWMD permitting, and bidding phase services, for the <br />replacement of well #S-1 at the South Oslo Road Water Treatment plant. <br />SCOPE OF WORK <br />TASK 1- PREPARATION OF DESIGN DOCUMENTS - WELL <br />Consultant will review the existing wellsite for potential siting of a new well to be <br />drilled in the near vicinity of the existing well. Consultant will review the <br />salvageable equipment to be used and new equipment to be designed/ specified for <br />the replacement well. <br />Property Survey and Topography - The Consultant will develop a survey for the <br />wellsite to determine extent of IRCU property. The Consultant will also conduct <br />topographic survey of the new site to collect topography, establish horizontal <br />control, and establish a benchmark for design and construction purposes. <br />Consultant will review existing utilities within a 100 -ft radius from the existing <br />wellsite, including known underground utilities and existing sanitary hazards. <br />Consultant will walk the site to review landmarks; conflicts with existing structures; <br />setbacks from existing utilities and facilities; and review the sites and adjacent areas <br />for items which may affect permitting of a new well site. <br />173 <br />
The URL can be used to link to this page
Your browser does not support the video tag.