Laserfiche WebLink
for each lift of cement, completion interval drilling and associated testing, <br />preliminary well development, acid treatment, pump development and testing. <br />Consultant will also provide well performance testing, including water level <br />measurements, specific capacity analysis, and basic water quality testing <br />(conductivity, chlorides, silt density indices—SDI's and sand testing). Consultant <br />will provide up to 220 hours of on-site hydrogeological services (JLA) for well #S-1. <br />Consultant will review drilling, geologic and geophysical data and provide <br />recommendations for casing setting depths and completion intervals. Consultant <br />will review completion interval drilling and testing data and recommend if acid <br />treatment is necessary, review acid treatment and testing plans. Consultant will <br />review pump test results and provide recommendations for permanent pump <br />setting depth and recommended in service pumping rate. <br />Consultant will coordinate water quality testing, which includes clearance water <br />quality in accordance with FDEP regulations and additional water quality for <br />membrane projections. <br />Consultant will provide contract document interpretation, shop drawing and pay <br />request review and change order requests. These construction phase services <br />assume the well location, and formation water disposal determined above will not <br />change during construction. Shop drawing submittal will be reviewed for <br />conformance with the intent of the contract documents. Shop drawing will be <br />submitted directly to the Consultant. The Consultant will review the submittal and <br />return copies to the contractor and Indian River County Utilities. <br />KHA will prepare a well completion report for well #S-1, including a summary of <br />the lithologic logs, field logs, hydrologic and water quality data, and preparation of <br />figures, data, lithologic logs, and appropriate attachments. <br />The well completion report and data will be used for future well clearance when the <br />wells are placed into service. Up to six (6) final copies of the report will be <br />furnished to Owner. <br />The installation of the well pump, column piping, and electrical service for <br />operation of the well #S-1 is assumed to be included under the well driller contract. <br />Consultant will prepare and submit a FDEP certification of construction completion <br />and request for clearance to place well #S-1 into operation (FDEP Form 62- <br />555.900(9)). Record drawing information will be provided by the contractors and <br />included with the certification package. <br />178 <br />