Laserfiche WebLink
TASK 4 — BIDDING PHASE <br />Consultant will prepare electronic copy of bid documents, including drawings and <br />specifications for IRC purchasing department to be utilized for bidding purposes. <br />Front-end documents will be prepared by Indian River County purchasing. <br />IRC purchasing department will advertise and administer the procurement of the <br />bidding and respond to potential bidder questions. Consultant will attend a <br />mandatory pre-bid meeting, respond to contractor questions and prepare <br />addendum(s), if required, which will be distributed to all the contract document <br />holders by IRC purchasing department. <br />Consultant will review bids, provide a summary of comments, and a letter that <br />recommends the most responsive and responsible bidder. <br />TASK 5 — CONSTRUCTION PHASE SERVICES - FLORIDAN AQUIFER WELL, <br />WELLHEAD #S -1R, RAW WATERMAIN <br />Consultant will provide construction phase services for the drilling of well #S-1, <br />wellhead installation, startup and operational testing of the well, and oversight of <br />the raw watermain construction. Final FDEP certification of Well #S-1 and raw <br />watermain will be provided. <br />The Consultant's site visits will be for the purpose of endeavoring to provide the <br />Owner a greater degree of confidence that the completed work of its contractors <br />will generally conform to the construction documents. The Consultant neither <br />guarantees the performance of contractors, nor assumes responsibility for any <br />contractor's failure to perform its work in accordance with the contract documents. <br />Work that the Consultant believes does not comply with the contract documents <br />will be brought to the attention of Indian River County Utilities and the contractor. <br />The Consultant shall have no responsibility for any contractor's means, methods, <br />techniques, equipment choice and usage, sequence, schedule, safety programs, or <br />safety practices, nor shall the Consultant have any authority or responsibility to <br />stop or direct the work of any contractor. <br />Consultant will provide construction phase services including hydrogeological <br />services, performance testing of each well, and preparation of a well completion <br />report for well #S-1 Floridan Aquifer well. Consultant will utilize subconsultant <br />services of JLA Geosciences, Inc. for the Hydrogeologic Consulting Services (JLA). <br />Consultant will provide hydrogeological support and observation services during <br />Upper Floridan Aquifer well #S-1 construction including surface casing installation, <br />pilot hole drilling, geophysical logging, casing installation, grouting casing in place <br />177 <br />