My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/15/2022 (4)
CBCC
>
Meetings
>
2020's
>
2022
>
02/15/2022 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 12:32:17 PM
Creation date
6/20/2022 12:13:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/15/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Horizontal datum to be NAD 83/90 <br />CONSULTANT will perform a hydraulic analysis to size the RWM and include <br />capacity for potential future additional well. The RWM will be sized for up to 4.0 <br />MGD of raw water capacity. <br />Consultant will prepare project specifications for the project. Technical <br />specifications for the raw water main, directional bores, telemetry and general <br />electrical provisions will be provided. <br />CONSULTANT will coordinate and provide up to ten (10) subsurface investigation <br />using soft -dig technique for the HDD and anticipated U/G conflicts. <br />Consultant will provide four (4) printed hard copies at each review and electronic <br />version in pdf and Word format for review. <br />Consultant will prepare opinions of probable construction costs for the final version <br />of the pipeline and pump stations projects. <br />TASK 3 - PERMITTING <br />Consultant will evaluate the need for permitting a replacement well, including <br />preparation of a letter modification to SJRWMD Permit and an updated location map <br />and Table A (description of wells). No changes to existing permit allocation shall be <br />requested in the letter modification. <br />The Consultant will prepare and submit an FDEP permit application 62-555.900(1) for <br />the proposed surficial wellhead, and raw watermain improvements for the new well, <br />including a permit application fee paid for by IRCU. The Consultant will submit one <br />permit application for the wellhead work and the raw watermain connection to the <br />existing. The permit application will be submitted when the drawings and <br />specifications are in a condition for permitting agency review. Consultant will <br />respond to up to two requests for additional information (RFI's from DEP). <br />The permit application fee of $2,000 for FDEP will be paid for by Indian River County <br />Utilities (IRCU). <br />The permit application fee for the SFWMD construction permit will be paid by water <br />well contractor. <br />176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.