Laserfiche WebLink
drawings. The drawings will be produced in AutoCAD Civil 3D 2018 and will <br />utilize Indian River County standards. <br />Consultant will submit 90% and 100% complete drawing sets for Owner review. <br />Consultant will prepare construction drawings for the pipeline consisting of the <br />following: <br />• Cover sheet <br />• General Notes <br />• Key Map <br />• Plan and Profile sheets for the raw water main (approx. 4 sheets at 1" =30') <br />• Miscellaneous pipe details (2) <br />• General Details (2) <br />• HDD Plan & Profile <br />It is anticipated that approximately 8 -10 sheets for the raw water pipeline will be <br />prepared. <br />Topographic Survey <br />CONSULTANT will prepare limited use topographic survey of the existing wellsite <br />and the water treatment plant and the RWM corridor and utilize part of the RO <br />plant survey prepared under work order #1. It is assumed all wellsite work will be <br />constructed on Indian River County owned or leased land. The survey scope for the <br />well site consists of the following items: <br />• Obtain existing elevations within a 120ft x 60ft rectangle south of the <br />existing well S-1. <br />• Location of the existing above ground improvements along the raw <br />watermain, wellsite, and water plant site. <br />• IRCU established benchmarks will be used for elevation reference. <br />The vertical datum elevations will be referenced to NAVD 88 datum. <br />Horizontal datum to be NAD 83/90 <br />The survey scope for the raw watermain pipeline consists of the following items: <br />• Upland route survey from wellsite to the water plant site - <br />approximate length: 900 LF <br />• Obtain surface locations of existing improvements within select <br />portions of the RWM corridor <br />• Topographic survey and data at 100 -ft intervals and location of <br />markings for known underground utilities <br />• The vertical datum elevations will be referenced to NAVD 88 datum. <br />175 <br />