My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-112
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2022 3:30:38 PM
Creation date
6/24/2022 3:27:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/14/2022
Control Number
2022-112
Agenda Item Number
8.B.
Entity Name
Hinterland Group, Inc.
Subject
First Extension and Amendment to Continuing Contract Agreement for Utilities Labor Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fxhihit 1 - Amendment 1 (Hinterland Grounl <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price Bid <br />Revised Unit Price <br />Material <br />Installed Unit <br />Price Bid <br />Revised Unit <br />Price Install <br />Total Unit Price <br />(Material+ <br />Installation) <br />Revised total Unit <br />Price (Material+ <br />Installation) <br />SECTION B - Restoration <br />B1 <br />Pavement Repair and Replacement <br />(a) Asphalt Road <br />1 <br />S.Y. <br />$ 65.00 <br />$ 73.87 <br />$ <br />65.00 <br />$73.87 <br />(b) Asphalt Driveway <br />1 <br />S.Y. <br />1 <br />$ 50.00 <br />$ 56.83 <br />$ <br />50.00 <br />$56.83 <br />(c) Asphalt Millings <br />1 <br />S.Y. <br />$ 35.00 <br />$ 39.78 <br />$ <br />35.00 <br />$39.78 <br />(d) Asphalt overiay <br />1 <br />S.Y. <br />$ 30.00 <br />$ 34.10 <br />$ <br />30.00 <br />$34.1 <br />(e) Add. S-3 Asphalt <br />1 <br />Ton <br />$ 350.00 <br />$ 397.78 <br />$ <br />350.00 <br />$397.78 <br />(f) Cold Mix Asphalt <br />1 <br />Ton <br />$ 200.00 <br />$ 227.30 <br />$ <br />200.00 <br />$227.30 <br />(g) Concrete Driveway (6") <br />1 <br />S.Y. <br />$ 65.00 <br />$ 73.87 <br />$ <br />65.00 <br />$73.87 <br />(h) Concrete Sidewalk (4") <br />1 <br />S.Y. <br />$ 50.00 <br />$ 56.83 <br />$ <br />50.00 <br />$56.83 <br />(i) Concrete Curb <br />1. Curb and Gutter <br />1 <br />L. F. <br />$ 50.00 <br />$ 56.83 <br />$ <br />50.00 <br />$56.83 <br />2.'D'Curb <br />1 <br />L. F. <br />$ 50.00 <br />$ 56.83 <br />$ <br />50.00 <br />$56.83 <br />(j) Concrete Driveway Paver Block <br />1 <br />S.Y. <br />$ 45.00 <br />$ 51.14 <br />$ <br />45.00 <br />$51.14 <br />(k) Lime rock Driveway <br />1 <br />S.Y. <br />$ 35.00 <br />$ 39.78 <br />$ <br />35.00 <br />$39.78 <br />(1) jAsphalt sidewalk <br />1 <br />S.Y. <br />$ 60.00 <br />$ 68.19 <br />$ <br />60.00 <br />$68.19 <br />B2 <br />Milling Asphalt <br />1 <br />S.Y. <br />1 <br />$ 25.00 <br />$ 28.41 <br />$ <br />25.00 <br />$28.41 <br />B3 <br />Coquina Rock Base <br />1 <br />C.Y. <br />$ 30.00 <br />$ 34.10 <br />$ <br />30.00 <br />$34.10 <br />64 <br />Flowable Fill <br />(a) 0 -4 cy (include short load fees) <br />1 <br />C.Y. <br />$ 350.00 <br />$ 397.78 <br />$ <br />350.00 <br />$397.78 <br />(b) 4 - 8 cy (include short load fees) <br />1 <br />C.Y. <br />$ 275.00 <br />$ 312.54 <br />$ <br />275.00 <br />$312.54 <br />rB5 <br />(c) > 8cy <br />1 <br />C.Y. <br />$ 200.00 <br />$ 227.30 <br />$ <br />200.00 <br />$227.30 <br />Miscellaneous Materials <br />(a) Sand <br />1 <br />C.Y. <br />$ 45.00 <br />$ 51.14 <br />$ <br />45.00 <br />$51.14 <br />(b) Fill <br />1 <br />C.Y. <br />$ 45.00 <br />$ 51.14 <br />$ <br />45.00 <br />$51.14 <br />(c) #57 Rock <br />1 <br />C.Y. <br />$ 45.00 <br />$ 51.14 <br />$ <br />45.00 <br />$51.14 <br />(d) Shell Rock <br />1 <br />C.Y. <br />$ 55.00 <br />$ 62.51 <br />$ <br />55.00 <br />$62.51 <br />(e) Suremix Concrete 80# <br />1 <br />Bag <br />$ 25.00 <br />$ 28.41 <br />$ <br />25.00 <br />$28.41 <br />B6 <br />Sod Replacement <br />(a) Bahia <br />1 <br />S.Y. <br />$ 4.00 <br />$ 4.55 <br />$ <br />4.00 <br />$4.55 <br />(b) IFloratam <br />1 <br />S.Y. <br />$ 6.00 <br />$ 6.82 <br />$ <br />6.00 <br />$6.82 <br />B7 <br />Seed and Mulch <br />1 <br />S.Y. <br />$ 5.00 <br />$ 5.68 <br />$ <br />5.00 <br />$5.68 <br />B8 <br />Mailbox Removal and Reinstallation <br />1 <br />EA <br />$ 800.00 <br />$ 909.20 <br />$ <br />800.00 <br />$909.20 <br />89 <br />Sprinkler System Repair per Yard <br />1 <br />1 EA <br />$ 1,200.00 <br />$ 1,363.80 <br />$ <br />1,200.00 <br />$1,363.80 <br />B10 Handicap Ramp Restoration <br />1 <br />1 EA <br />$ 500.00 <br />$ 568.25 <br />$ <br />500.00 <br />$568.25 <br />SECTION C - High Density Polyethylene Piping & Horizontal Directional Boring <br />C3 <br />High Density Polyethylene Pipe (HDPE) -Trench <br />(a) 2 -inch <br />1 <br />L. F. <br />$ <br />3.00 <br />$ <br />3.41 <br />$ 12.00 <br />$ 13.64 <br />$ <br />15.00 <br />$17.05 <br />(b) 4 -inch <br />1 <br />L. F. <br />$ <br />6.00 <br />$ <br />6.82 <br />$ 14.00 <br />$ 15.91 <br />$ <br />20.00 <br />$22.73 <br />(c) 6 -inch <br />1 <br />L. F. <br />$ <br />10.00 <br />$ <br />11.37 <br />$ 16.00 <br />$ 18.18 <br />$ <br />26.00 <br />$29.55 <br />(d) 8 -inch <br />1 <br />L. F. <br />$ <br />18.00 <br />$ <br />20.46 <br />$ 18.00 <br />$ 20.46 <br />$ <br />36.00 <br />$40.91 <br />(e) 12 inch <br />1 <br />L. F. <br />$ <br />32.00 <br />$ <br />36.37 <br />$ 20.00 <br />$ 22.73 <br />$ <br />52.00 <br />$59.10 <br />(f) 16 -inch <br />1 <br />L. F. <br />$ <br />60.00 <br />$ <br />68.19 <br />$ 24.00 <br />$ 27.28 <br />$ <br />84.00 <br />$95.47 <br />(g) 18 -inch <br />1 <br />L. F. <br />$ <br />70.00 <br />$ <br />79.56 <br />$ 30.00 <br />$ 34.10 <br />$ <br />100.001 <br />$113.65 <br />(h) 20 -inch <br />1 <br />L. F. <br />$ <br />85.00 <br />$ <br />96.60 <br />$ 40.00 <br />$ 45.46 <br />$ <br />125.00 <br />$142.06 <br />(i) 24 -inch <br />1 <br />L. F. <br />$ <br />110.00 <br />$ <br />125.02 <br />$ 50.00 <br />$ 56.83 <br />$ <br />160.00 <br />$181.84 <br />C2 <br />Horizontal Directional Boring (HDPE) -HDD <br />(b) 4 -inch <br />1 <br />LF. <br />$ <br />22.00 <br />$ <br />25.00 <br />$ 12.00 <br />$ 13.64 <br />$ <br />34.00 <br />$38.64 <br />(c) 6 -inch <br />1 <br />L. F. <br />$ <br />28.00 <br />$ <br />31.82 <br />$ 14.00 <br />$ 15.91 <br />$ <br />42.00 <br />$47.73 <br />(d) 8 -inch <br />1 <br />L. F. <br />$ <br />34.00 <br />$ <br />38.64 <br />$ 16.00 <br />$ 18.18 <br />$ <br />50.00 <br />$56.83 <br />(e) 12 inch <br />1 <br />LF. <br />$ <br />64.00 <br />$ <br />72.74 <br />$ 20.00 <br />$ 22.73 <br />$ <br />84.00 <br />$95.47 <br />(f) 16 -inch <br />1 <br />LF. <br />$ <br />82.00 <br />$ <br />93.19 <br />$ 25.00 <br />$ 28.41 <br />$ <br />107.00 <br />$121.61 <br />(g) 18 -inch <br />1 <br />L. F. <br />$ <br />100.001 <br />$ <br />113.65 <br />$ 30.00 <br />$ 34.10 <br />$ <br />130.00 <br />$147.75 <br />(h) 20 -inch <br />1 <br />LF. <br />$ <br />125.001 <br />$ <br />142.06 <br />$ 40.00 <br />$ 45.46 <br />$ <br />165.00 <br />$187.52 <br />(i) 24 -inch <br />1 <br />1 L. F. <br />1 $ <br />160.001 <br />$ <br />181.84 <br />$ 50.00 <br />$ 56.83 <br />$ <br />210.00 <br />$238.67 <br />7of9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.