Exhibit 1 - Amendment I tHinterland GrouDI
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Material Unit
<br />Price Bid
<br />Revised Unit Price
<br />Material
<br />Installed Unit
<br />Price Bid
<br />Revised Unit
<br />Price Install
<br />Total Unit Price
<br />(Material+
<br />Installation)
<br />Revised total Unit
<br />Price (Material+
<br />Installation)
<br />C3
<br />Horizontally Directional Drilled -PVC Driveway Bores
<br />20 -foot length
<br />(a) 4 -inch
<br />1
<br />EA.
<br />$
<br />2,500.00
<br />$ 2,841.25
<br />$
<br />500.00
<br />$
<br />568.25
<br />$ 3,000.00
<br />$3,409.50
<br />(b) 6 -inch
<br />1 1
<br />EA.
<br />1 $
<br />3,500.00
<br />1 $ 3,977.75 1
<br />$
<br />500.00 1
<br />$
<br />568.25
<br />$ 4,000.00
<br />$4,546.00
<br />(c) 8 -inch
<br />1 1
<br />EA.
<br />1 $
<br />4,500.00
<br />1 $ 5,114.25 1
<br />$
<br />500.00 1
<br />$
<br />568.25
<br />$ 5,000.00
<br />$5,682.50
<br />(d) 12 -inch
<br />1 1
<br />EA.
<br />1 $
<br />5,000.00
<br />$ 5,682.50
<br />$
<br />500.00
<br />$
<br />568.25
<br />$ 5,500.00
<br />$6,250.75
<br />(a) 4 -inch
<br />1
<br />EA.
<br />$
<br />3,500.00
<br />$ 3,977.75
<br />$
<br />500.00
<br />$
<br />568.25
<br />$ 4,000.00
<br />$4,546.00
<br />(b) 6 -inch
<br />1
<br />EA.
<br />$
<br />4,500.00
<br />$ 5,114.25
<br />$
<br />500.00
<br />$
<br />568.25
<br />$ 5,000.00
<br />$5,682.50
<br />(c) 8 -inch
<br />1
<br />EA.
<br />$
<br />5,000.00
<br />$ 5,682.50
<br />$
<br />500.00
<br />$
<br />568.25
<br />$ 5,500.00
<br />$6,250.75
<br />(d) 12 -inch
<br />1
<br />EA.
<br />$
<br />5,500.00
<br />$ 6,250.75
<br />$
<br />500.00
<br />$
<br />568.25
<br />$ 6,000.00
<br />$6,819.00
<br />60 -foot length
<br />(a) 4 -inch
<br />1
<br />EA.
<br />$
<br />4,000.00
<br />$ 4,546.00
<br />$
<br />750.00
<br />$
<br />852.38
<br />$ 4,750.00
<br />$5,398.38
<br />(b) 5 -inch
<br />1I
<br />EA.
<br />$
<br />5,000.00
<br />$ 5,682.50
<br />$
<br />750.00
<br />$
<br />852.38
<br />$ 5,750.00
<br />$6,534.88
<br />(c) 8 -inch
<br />1I
<br />EA.
<br />1 $
<br />5,500.00
<br />1 $ 6,250.75
<br />$
<br />750.00
<br />$
<br />852.38
<br />$ 6,250.00
<br />$7,103.13
<br />(d) 12 -inch
<br />1 1
<br />EA.
<br />1 $
<br />6,000.00
<br />1 $ 6,819.00
<br />$
<br />750.00
<br />$
<br />852.38
<br />$ 6,750.00
<br />$7,671.38
<br />SECTION D: Time and Materials Rates (TO BE USED ON T&M
<br />ORDERS ONLY)
<br />D1
<br />Equipment Hourly Rates
<br />(a) Trackhoe (specify model)
<br />(medium)
<br />1
<br />Hr.
<br />NA
<br />$
<br />75.00
<br />$
<br />85.24
<br />$ 75.00
<br />$85.24
<br />(large)
<br />1
<br />Hr.
<br />NA
<br />$
<br />125.00
<br />$
<br />142.06
<br />$ 125.00
<br />$142.06
<br />(b) Combination Backhoe
<br />1
<br />Hr.
<br />NA
<br />$
<br />65.00
<br />$
<br />73.87
<br />$ 65.00
<br />$73.87
<br />(c) Front end Loader
<br />1
<br />Hr.
<br />NA
<br />$
<br />85.00
<br />$
<br />96.60
<br />$ 85.00
<br />$96.60
<br />(d) Grader
<br />1
<br />Hr.
<br />NA
<br />$
<br />120.00
<br />$
<br />136.38
<br />$ 120.00
<br />$136.38
<br />(e) Dump Truck ( 9 C.Y.)
<br />1
<br />Hr.
<br />NA
<br />$
<br />85.00
<br />$
<br />96.60
<br />$ 85.00
<br />$96.60
<br />(f) Tandem Dump Truck (18 C.Y.)
<br />1
<br />Hr.
<br />NA
<br />$
<br />85.00
<br />$
<br />96.60
<br />$ 85.00
<br />$96.60
<br />(g) Forklift
<br />1
<br />Hr.
<br />NA
<br />$
<br />50.00
<br />$
<br />56.83
<br />$ 50.00
<br />$56.83
<br />(h) Crew Truck with hand tools
<br />1
<br />Hr.
<br />NA
<br />$
<br />25.00
<br />$
<br />28.41
<br />$ 25.00
<br />$28.41
<br />(i) Trash Pump 3"
<br />1
<br />Hr.
<br />NA
<br />$
<br />15.00
<br />$
<br />17.05
<br />$ 15.00
<br />$17.05
<br />(j) Trash Pump 2"
<br />1
<br />Hr.
<br />NA
<br />$
<br />10.00
<br />$
<br />11.37
<br />$ 10.00
<br />$11.37
<br />(k) Walk behind Vibrating Roller
<br />1
<br />Hr.
<br />NA
<br />$
<br />20.00
<br />$
<br />22.73
<br />$ 20.00
<br />$22.73
<br />(I) Rev. Plate Compactor
<br />1
<br />Hr.
<br />NA
<br />$
<br />30.00
<br />$
<br />34.10
<br />$ 30.00
<br />$34.10
<br />(m) Jumping Jack
<br />1
<br />Hr.
<br />NA
<br />$
<br />10.00
<br />$
<br />11.37
<br />$ 10.00
<br />$11.37
<br />(n) Cut off saw (14")
<br />1
<br />Hr.
<br />NA
<br />$
<br />5.00
<br />$
<br />5.68
<br />$ 5.00
<br />$5.68
<br />(o) Street saw (14")
<br />1
<br />Hr.
<br />NA
<br />$
<br />5.00
<br />$
<br />5.68
<br />$ 5.00
<br />$5.68
<br />(p) Gradall
<br />1
<br />Hr.
<br />NA
<br />$
<br />120.00
<br />$
<br />136.38
<br />$ 120.00
<br />$136.38
<br />(q) Roller
<br />1
<br />Hr.
<br />NA
<br />$
<br />85.00
<br />$
<br />96.60
<br />$ 85.00
<br />$96.60
<br />(r) Welding Truck
<br />1
<br />Hr.
<br />NA
<br />$
<br />85.00
<br />$
<br />96.60
<br />$ 85.00
<br />$96.60
<br />(s) Welder
<br />1
<br />Hr.
<br />NA
<br />$
<br />85.00
<br />$
<br />96.60
<br />$ 85.00
<br />$96.60
<br />(t) Cement Mixer
<br />1
<br />Hr.
<br />NA
<br />$
<br />15.00
<br />$
<br />17.05
<br />$ 15.00
<br />$17.05
<br />(u) Box Blade
<br />1
<br />Hr.
<br />NA
<br />$
<br />50.00
<br />$
<br />56.83
<br />$ 50.00
<br />$56.83
<br />(v) Water Truck
<br />1
<br />Hr.
<br />NA
<br />$
<br />120.00
<br />$
<br />136.38
<br />$ 120.00
<br />$136.38
<br />(w) 1000 gpm sump pump
<br />1
<br />Hr.
<br />NA
<br />$
<br />25.00
<br />$
<br />28.41
<br />$ 25.00
<br />$28.41
<br />D2
<br />Crew Hourly Rates
<br />(a) Crew Man
<br />1
<br />Hr.
<br />NA
<br />$
<br />45.00
<br />$
<br />51.14
<br />$ 45.00
<br />$51.14
<br />(b) Foreman
<br />1
<br />Hr.
<br />NA
<br />$
<br />75.00
<br />$
<br />85.24
<br />$ 75.00
<br />$85.24
<br />(c) Supervisor
<br />1
<br />Hr.
<br />NA
<br />$
<br />100.00
<br />$
<br />113.65
<br />$ 100.00
<br />$113.65
<br />(d) 3 man crew includes 1 supervisor
<br />1
<br />Hr.
<br />NA
<br />$
<br />285.00
<br />$
<br />323.90
<br />$ 285.00
<br />$323.90
<br />(e) 4 man crew includes 1 supervisor
<br />1
<br />Hr.
<br />NA
<br />$
<br />325.00
<br />$
<br />369.36
<br />$ 325.00
<br />$369.36
<br />(f) 5 man crew includes 1 supervisor
<br />1
<br />Hr,
<br />NA
<br />$
<br />400.00
<br />$
<br />454.60
<br />$ 400.00
<br />$454.60
<br />D3
<br />Overtime Crew Hourly Rates
<br />(a) Crew Man
<br />1
<br />Hr.
<br />NA
<br />$
<br />67.50
<br />$
<br />76.71
<br />$ 67.50
<br />$76.71
<br />(b) Foreman
<br />1
<br />Hr.
<br />NA
<br />$
<br />112.50
<br />$
<br />127.86
<br />$ 112.50
<br />$127.86
<br />(c) Supervisor
<br />1
<br />Hr.
<br />NA
<br />$
<br />150.00
<br />$
<br />170.48
<br />$ 150.00
<br />$170.48
<br />(d) 3 man crew includes i supervisor
<br />1
<br />Hr.
<br />NA
<br />$
<br />427.50
<br />$
<br />485.85
<br />$ 427.50
<br />$485.85
<br />(e) 4 man crew includes 1 supervisor
<br />1
<br />Hr.
<br />NA
<br />$
<br />487.50
<br />$
<br />SS4.04
<br />$ 487.50
<br />$554.04
<br />(f) 5 man crew includes 1 supervisor
<br />1
<br />Hr.
<br />NA
<br />$
<br />600.00
<br />$
<br />681.90
<br />$ 600.00
<br />$681.90
<br />D4
<br />Nightime Crew Hourly Rates
<br />(a) Crew Man
<br />1
<br />Hr.
<br />NA
<br />$
<br />90.00
<br />$
<br />102.29
<br />$ 90.00
<br />$102.29
<br />(b) IForeman
<br />1
<br />Hr.
<br />NA
<br />$
<br />150.00
<br />$
<br />170.48
<br />$ 150.00
<br />$170.48
<br />IN ISupervisor
<br />1
<br />Hr.
<br />NA
<br />$
<br />200.00
<br />$
<br />227.30
<br />$ 200.00
<br />$227.30
<br />8of9
<br />
|