Laserfiche WebLink
WORK ORDER NUMBER 9 <br />UPPER FLORIDAN AQUIFER MODELING AND CONSUMPTIVE USE <br />PERMIT MODIFICATION <br />EXIMIT A <br />SCOPE OF WORK <br />PROJECT UNDERSTANDING <br />Indian River County (County) operates two water treatment plants (North County and <br />South County) and two associated wellfields (North and South) that provide potable water <br />to the County's customers. The County currently operates under Consumptive Use Permit <br />(CUP) No. 10524, issued by St. Johns River Water Management District (SJRWMD). The <br />allocation in the current CUP allows for up to 6.438 million gallons per day (mgd) to be <br />withdrawn from the North wellfield and 6.4 mgd from the South wellfield, for a total <br />allocation of 12.438 mgd. The County anticipates that by the permit expiration date in <br />2032, the potable water demand will result in an increased need for 3.390 mgd of additional <br />water, for a new total allocation of 16.228 mgd. <br />The County has recently explored numerous options for reaching the 2032 demand, <br />including increasing withdrawal from existing wellfields, adding new wells in the south <br />county area, and splitting flows between the two wellfields. The County is currently in the <br />process of investigating new water sources (APPZ/Lower Floridan Aquifer) for long-term <br />water supply needs. In the meantime, the County wishes to revisit the option of obtaining <br />the additional 3.390 mgd from the existing North County wellfield (9 existing wells), <br />identifying the impacted Existing Legal Users (ELU), and preparing a well avoidance plan <br />and mitigation strategy for future impacts, if feasible. <br />The following Scope of Services outlines the approach to prepare the appropriate <br />SJRWMD groundwater model, quantify impacts from the increased pumping, summarize <br />the ELUs, conduct a well survey, and prepare an avoidance plan. Upon completion of the <br />modeling and ELU assessment, Kimley-Horn (Consultant) will prepare the SJRWMD <br />application for modification of the CUP. The Consultant will contract with JLA <br />Geosciences (JLA) to serve as a subconsultant for the preparation of the groundwater <br />modeling. The Kimley-Horn and JLA team shall be collectively referred to as the <br />Consultant in the following Scope of Services. <br />SCOPE OF SERVICES <br />Task 1: Modeling Approach Memorandum (Lump Sum) <br />The Consultant shall review CUP and groundwater data from the County and SJRWMD, <br />including ELU facilities and allocations, SJRWMD impact evaluation criteria and <br />historical monitoring data for water levels, water quality, and well withdrawals to form the <br />basis of the approach for the groundwater modeling effort that will support a request for <br />Page 1 of 6 <br />