Exhibit 1 -Amendment 1 (CK Contractors & Dove looment)
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Material Unit
<br />Price Bid
<br />Revised Unit
<br />Price Material
<br />Installed Unit
<br />Price Bid
<br />Revised Unit
<br />Price Install
<br />Total Unit Price
<br />(Material +
<br />Installatior)
<br />Revised total unit
<br />Price (Material +
<br />Installation)
<br />(b)
<br />0'-6' (double)
<br />1
<br />EA.
<br />$
<br />348.14
<br />$ 395.66
<br />$ 848.96
<br />$ 964.84
<br />$
<br />1,197.10
<br />$1,360.50
<br />(c)
<br />6' -Over (single)
<br />1
<br />EA.
<br />$
<br />322.39
<br />$ 366.40
<br />$ 904.96
<br />$ 1,028.49
<br />$
<br />1,227.35
<br />$1,394.88
<br />(d)
<br />6' -Over (double)
<br />1
<br />EA.
<br />$
<br />455.26
<br />$ 517.40
<br />$ 969.92
<br />$ 1,102.31
<br />$
<br />1,425.18
<br />$1,619.72
<br />A28 ISanitarySewer Services
<br />(constructed on existing sewer lines - lined)
<br />(single)
<br />1
<br />EA.
<br />$
<br />396.55
<br />$ 450.68
<br />$ 904.96
<br />$ 1,028.49
<br />$
<br />1,301.51
<br />$1,479.17
<br />6' (double)
<br />1
<br />EA.
<br />$
<br />422.30
<br />$ 479.94
<br />$ 969.92
<br />$ 1,102.31
<br />5
<br />1,392.22
<br />$1,582.26
<br />j6'
<br />-Over(single)
<br />1
<br />EA.
<br />$
<br />396.55
<br />$ 450.68
<br />$ 1,044.96
<br />$ 1,187.60
<br />$
<br />1,441.51
<br />$1,638.28
<br />Over(double)
<br />1
<br />EA.
<br />$
<br />422.30
<br />$ 479.94
<br />$ 1,131.20
<br />$ 1,285.61
<br />$
<br />1,553.50
<br />$1,765.55
<br />A29 Sanitary Sewer Cleanouts
<br />(to existing sanitary sewer laterals)
<br />(a) 0'-6'(4")
<br />1
<br />EA.
<br />$
<br />266.77
<br />$ 303.18
<br />5 754.88
<br />$ 857.92
<br />$
<br />1,021.65
<br />$1,161.11
<br />(b) 6' -Over (4")
<br />1
<br />EA.
<br />$
<br />266.77
<br />$ 303.18
<br />$ 969.92
<br />$ 1,102.31
<br />$
<br />1,236.69
<br />$1,405.50
<br />(c) 0'-6' (6")
<br />1
<br />EA.
<br />$
<br />317.24
<br />$ 360.54
<br />$ 757.12
<br />$ 860.47
<br />$
<br />1,074.36
<br />$1,221.01
<br />(d) 6' -Over (6")
<br />1
<br />EA.
<br />$
<br />317.24
<br />$ 360,54
<br />$ 969.92
<br />$ 1,102.31
<br />$
<br />1,287.16
<br />$1,462.86
<br />A30 Cleanout Ring and Cover
<br />1
<br />EA.
<br />$
<br />105.06
<br />$ 119.40
<br />$ 283.36
<br />$ 322.04
<br />$
<br />388.42
<br />$441.44
<br />(constructed on new or existing cleanouts)
<br />A31 Water Services (on 6" or smaller main)
<br />(constructed in conjunction with water main)
<br />(a) 1" (single short)
<br />1
<br />EA.
<br />$
<br />603.58
<br />$ 685.97
<br />$ 489.44
<br />$ 556.25
<br />$
<br />1,093.02
<br />$1,242.22
<br />(b) 1" (single long)
<br />1
<br />EA.
<br />$
<br />650.96
<br />$ 739.82
<br />$ 489.44
<br />S 556.25
<br />$
<br />1,140.40
<br />$1,296.06
<br />(c) 1" (double short)
<br />1
<br />EA.
<br />$
<br />772.50
<br />5 877.95
<br />$ 489.44
<br />$ 556.25
<br />$
<br />1,261.94
<br />$1,434.19
<br />(d) 1" (double long)
<br />1
<br />EA.
<br />$
<br />785.89
<br />$ 893.16
<br />$ 489.44
<br />$ 556.25
<br />$
<br />1,275.33
<br />$1,449.41
<br />(e) 2" (single short)
<br />1
<br />EA.
<br />$
<br />2,279.39
<br />$ 2,590.53
<br />$ 489.44
<br />$ 556.25
<br />$
<br />2,768.83
<br />$3,146.78
<br />(f) 2" (single long)
<br />1
<br />EA.
<br />$
<br />2,521.44
<br />$ 2,865.62
<br />$ 489.44
<br />$ 556.25
<br />$
<br />3,010.88
<br />$3,421.87
<br />(g) 2" (double short)
<br />1
<br />EA.
<br />$
<br />3,926.36
<br />$ 4,462.31
<br />$ 489.44
<br />$ 556.25
<br />$
<br />4,415.80
<br />$5,018.56
<br />(h) 2" (double long)
<br />1
<br />EA.
<br />$
<br />4,169.44
<br />$ 4,738.57
<br />$ 489.44
<br />$ 556,25
<br />$
<br />4,658.88
<br />$5,294.82
<br />A32 Water Services- Horizontally Drilled
<br />(constructed in conjunction with 6" or smaller water main)
<br />(a) 1" (single short)
<br />1
<br />EA.
<br />$
<br />603.58
<br />$ 685.97
<br />$ 1,307.04
<br />$ 1,485.45
<br />$
<br />1,910.62
<br />$2,171.42
<br />(b) 1" (single long)
<br />1
<br />EA.
<br />$
<br />603.58
<br />$ 685.97
<br />$ 1,307.04
<br />$ 1,485.45
<br />$
<br />1,910.62
<br />$2,171.42
<br />(c) 1" (double short)
<br />1
<br />EA.
<br />$
<br />772.50
<br />$ 877.95
<br />$ 1,307.04
<br />$ 1,485.45
<br />$
<br />2,079.54
<br />$2,363.40
<br />(d) 1" (double long)
<br />1
<br />EA.
<br />$
<br />785.89
<br />$ 893.16
<br />$ 1,307.04
<br />$ 1,485.45
<br />$
<br />2,092.93
<br />$2,378.61
<br />(e) 2" (single short)
<br />1
<br />EA.
<br />$
<br />2,279.39
<br />$ 2,590.53
<br />$ 1,480.64
<br />$ 1,682.75
<br />$
<br />3,760.03
<br />$4,273.27
<br />(f) 2" (single long)
<br />1
<br />EA.
<br />$
<br />2,315.44
<br />$ 2,631.50
<br />$ 1,480.64
<br />$ 1,682.75
<br />$
<br />3,796.08
<br />$4,314.24
<br />(g) 2" (double short)
<br />1
<br />EA.
<br />$
<br />3,926.36
<br />$ 4,462,31
<br />$ 1,480.64
<br />$ 1,682.75
<br />$
<br />5,407.00
<br />$6,145.06
<br />(h) 2" (double long)
<br />1
<br />EA.
<br />$
<br />4,169.44
<br />$ 4,738.57
<br />$ 1,480.64
<br />$ 1,682.75
<br />$
<br />5,650.08
<br />$6,421.32
<br />A33 lWater Services (on 6" or smaller main)
<br />(constructed on existing water main)
<br />(a) 1" (single short)
<br />1
<br />EA.
<br />$
<br />603.58
<br />$ 685.97
<br />$ 489.44
<br />$ 556.25
<br />$
<br />1,093.02
<br />$1,242.22
<br />(b) 1" (single long)
<br />1
<br />EA.
<br />$
<br />603.58
<br />$ 685.97
<br />$ 489.44
<br />$ 556.25
<br />$
<br />1,093.02
<br />$1,242.22
<br />(c) 1" (double short)
<br />1
<br />EA.
<br />$
<br />772.50
<br />$ 877.95
<br />$ 489.44
<br />$ 556.25
<br />$
<br />1,261.94
<br />$1,434.19
<br />(d) 1" (double long)
<br />1
<br />EA.
<br />$
<br />785.89
<br />$ 893.16
<br />$ 489.44
<br />$ 556.25
<br />$
<br />1,275.33
<br />$1,449.41
<br />(e) 2" (single short)
<br />1
<br />EA.
<br />$
<br />2,279.39
<br />$ 2,590.53
<br />$ 533.12
<br />$ 605.89
<br />$
<br />2,812.51
<br />$3,196.42
<br />(f) 2" (single long)
<br />1
<br />EA.
<br />$
<br />2,315.44
<br />$ 2,631.50
<br />$ 533.12
<br />$ 605.89
<br />$
<br />2,848.56
<br />$3,237.39
<br />(g) 2" (double short)
<br />1
<br />EA.
<br />$
<br />3,926.36
<br />$ 4,462.31
<br />$ 533.12
<br />$ 605.89
<br />$
<br />4,459.48
<br />$5,068.20
<br />(h) 2" (double long)
<br />1
<br />EA.
<br />$
<br />4,169.44
<br />$ 4,738.57
<br />$ 533.12
<br />$ 605.89
<br />$
<br />4,702.56
<br />$5,344.46
<br />A34 lWater Services- Horizontally Drilled
<br />(constructed on existing 6" or smaller water main)
<br />(a) 1" (single short)
<br />1
<br />EA.
<br />$
<br />603.58
<br />$ 685.97
<br />$ 1,307,04
<br />$ 1,485,45
<br />$
<br />1,910.62
<br />$2,171.42
<br />(b) 1" (single long)
<br />1
<br />EA.
<br />$
<br />603.58
<br />$ 685.97
<br />$ 1,307.04
<br />$ 1,485.45
<br />$
<br />1,910.62
<br />$2,171.42
<br />(c) 1" (double short)
<br />1
<br />EA.
<br />$
<br />772.50
<br />$ 877.95
<br />$ 1,307.04
<br />$ 1,485.45
<br />$
<br />2,079.54
<br />$2,363,40
<br />(d) 1" (double long)
<br />1
<br />EA.
<br />$
<br />785.89
<br />$ 893.16
<br />$ 1,307.04
<br />$ 1,485.45
<br />$
<br />2,092.93
<br />$2,378.61
<br />(e) 2" (single short)
<br />1
<br />EA.
<br />$
<br />27279.39
<br />$ 2,590.53
<br />$ 1,480.64
<br />$ 1,682.75
<br />$
<br />3,760.03
<br />$4,273.27
<br />(f) 2" (single long)
<br />1
<br />EA.
<br />$
<br />2,315.44
<br />$ 2,631.50
<br />5 1,480.64
<br />$ 1,682.75
<br />$
<br />3,796.08
<br />$4,314.24
<br />(g) 2" (double short)
<br />1
<br />EA.
<br />$
<br />3,926.36
<br />$ 4,462.31
<br />$ 1,480.64
<br />$ 1,682.75
<br />$
<br />5,407.00
<br />$6,145.06
<br />(h) 2" (double long)
<br />1 I
<br />EA.
<br />$
<br />4,169.4-41
<br />$ 4,738.57
<br />1 $ 1,480.64
<br />$ 1,682.75
<br />$
<br />5,6SO.081
<br />$6,421.32
<br />4 of 17
<br />
|