My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-112A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-112A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2022 12:59:19 PM
Creation date
6/27/2022 12:58:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/14/2022
Control Number
2022-112A
Agenda Item Number
8.B.
Entity Name
CK Contractors and Development, LLC
Subject
First Extension and Amendment to Continuing Contract Agreement for Utilities Labor Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 - Amendment 1 ICK Contractors & Develoomentl <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price Bid <br />Revised Unit <br />Price Material <br />Installed Unit <br />Price Bid <br />Revised Unit <br />Price Install <br />Total Unit Price <br />(Material + <br />Installation) <br />Revised total unit <br />Price (Material + <br />Installation) <br />A35 Water Services Additional Footage <br />(a) 1" HDPE Water Service <br />1 <br />L. F. <br />$ <br />1.99 <br />$ <br />2.26 <br />$ 9.78 <br />$ <br />11.11 <br />$ 11.77 <br />$13.37 <br />(b) 2" HDPE Water Service <br />1 <br />L. F. <br />$ <br />7.73 <br />$ <br />8.78 <br />5 9.78 <br />$ <br />11.11 <br />$ 17.50 <br />$19.89 <br />A36 lWater Services saddle size adjustments <br />(constructed on water main 6" or larger) <br />(a) 6" <br />1 <br />EA. <br />$ <br />95.79 <br />$ <br />108.87 <br />$ 162.40 <br />$ <br />184.57 <br />$ 258.19 <br />$293.43 <br />(b) 8" <br />1 <br />EA. <br />$ <br />109.18 <br />$ <br />124.08 <br />$ 162.40 <br />$ <br />184.57 <br />$ 271.58 <br />$308.65 <br />(c) 10" <br />1 <br />EA. <br />$ <br />132.87 <br />$ <br />151.01 <br />$ 162.40 <br />$ <br />184.57 <br />$ 295.27 <br />$335.57 <br />(d) 12" <br />1 <br />EA. <br />$ <br />154.50 <br />$ <br />175.59 <br />$ 162.40 <br />$ <br />184.57 <br />$ 316.90 <br />$360.16 <br />(e) 16" <br />1 <br />EA. <br />$ <br />211.15 <br />$ <br />239.97 <br />$ 162.40 <br />$ <br />184.57 <br />$ 373.55 <br />$424.5 <br />A37 Blow -off Assembly <br />1 <br />EA. <br />$ <br />745.72 <br />$ <br />847.51 <br />$ 162.40 <br />$ <br />184.57 <br />$ 908.12 <br />$1,032.08 <br />A38 Fire Hydrant Assembly (includes tee) <br />(constructed with new water main) <br />1 <br />EA. <br />$ <br />3,195.06 <br />$ <br />3,631.19 <br />$ 1,428.00 <br />$ <br />1,622.92 <br />$ 4,623.06 <br />$5,254.11 <br />A39 Fire Hydrant Assembly <br />(constructed on existing water main) <br />1 <br />EA. <br />$ <br />4,751.39 <br />$ <br />5,399.95 <br />$ 1,428.00 <br />$ <br />1,622.92 <br />$ 6,179.39 <br />$7,022.88 <br />A40 Bacteriological Sample Point <br />(constructed on new water main) <br />1 <br />EA. <br />$ <br />164.80 <br />$ <br />187.30 <br />$ 293.44 <br />$ <br />333.49 <br />$ 458.24 <br />$520.79 <br />A41 lBacterialogical Sample Point <br />(using a water service or fire hydrant) <br />1 <br />EA. <br />$ <br />164.80 <br />$ <br />187.30 <br />$ 293.44 <br />$ <br />333.49 <br />$ 458.24 <br />$520.79 <br />A42 2" Manual Air Release Valve <br />1 <br />EA. <br />$ <br />4,284.80 <br />$ <br />4,869.68 <br />$ 651.84 <br />$ <br />740.82 <br />$ 4,936.64 <br />$5,610.49 <br />A43 2" Automatic Air Release Valve <br />1 <br />EA. <br />$ <br />4,605.13 <br />$ <br />5,233.73 <br />$ 574.56 <br />$ <br />652.99 <br />$ 5,179.69 <br />$5,886.72 <br />A44 Dewatering <br />(a) 0'4 <br />1 <br />L. F. <br />NA <br />$ 18.91 <br />$ <br />21.49 <br />$ 18.91 <br />$21.49 <br />(b) 6'-12' <br />1 <br />L. F. <br />NA <br />$ 22.16 <br />$ <br />25.19 <br />$ 22.16 <br />$25.19 <br />(c) 12'-18' <br />1 <br />L. F. <br />NA <br />$ 28.27 <br />$ <br />32.13 <br />$ 28.27 <br />$32.13 <br />A45 Remove Pressure Pipe <br />$ <br />- <br />$0,00 <br />(a) 3" <br />1 <br />L. F. <br />NA <br />$ 7.34 <br />$ <br />8.34 <br />$ 7.34 <br />$8.34 <br />(b) 4" <br />1 <br />L.F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(c) 6" <br />1 <br />L. F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(d) 8" <br />1 <br />L. F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(e) 10" <br />1 <br />L. F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(f) 12" <br />1 <br />L.F. <br />NA <br />$ 15.09 <br />$ <br />17.15 <br />S 15.09 <br />$17.15 <br />(g) 16" <br />1 <br />L. F. <br />NA <br />$ 17.24 <br />$ <br />19.59 <br />$ 17.24 <br />$19.59 <br />(h) ICost Credit <br />1 <br />L. F. <br />NA <br />$ 0.10 <br />$ <br />0.11 <br />$ 0.10 <br />$0.11 <br />A46 Grout and Abandon Pressure Pipe <br />(a) 13" <br />1 <br />L. F. <br />$ <br />1.15 <br />$ <br />1.31 <br />$ 2.87 <br />$ <br />3.26 <br />$ 4.02 <br />$4.57 <br />(b) 4" <br />1 <br />L.F. <br />$ <br />1.15 <br />$ <br />1.31 <br />$ 2.87 <br />$ <br />3.26 <br />$ 4.02 <br />$4.57 <br />(c) 6" <br />1 <br />L. F. <br />$ <br />2.48 <br />$ <br />2.82 <br />$ 3.83 <br />$ <br />4.35 <br />$ 6.31 <br />$7.17 <br />(d) 8" <br />1 <br />L. F. <br />$ <br />2.98 <br />$ <br />3.38 <br />$ 3.83 <br />$ <br />4.35 <br />$ 6.81 <br />$7.74 <br />(e) 10" <br />1 <br />L. F. <br />$ <br />3.97 <br />$ <br />4.51 <br />$ 4.59 <br />$ <br />5.22 <br />$ 8.56 <br />$9.73 <br />(f) 12" <br />1 <br />L. F. <br />$ <br />4.79 <br />$ <br />5.44 <br />$ 4.59 <br />$ <br />5.22 <br />$ 9.38 <br />$10.66 <br />(g) 14" <br />1 <br />L. F. <br />$ <br />5.62 <br />$ <br />6.39 <br />$ 5.75 <br />$ <br />6.53 <br />$ 11.37 <br />$12.92 <br />(h) 16" <br />1 <br />L. F. <br />$ <br />6.45 <br />$ <br />7.33 <br />$ 5.75 <br />$ <br />6.53 <br />$ 12.19 <br />$13.86 <br />(i) 18" <br />1 <br />L. F. <br />$ <br />7.27 <br />$ <br />8.26 <br />$ 5.75 <br />$ <br />6.53 <br />$ 13.02 <br />$14.79 <br />(j) 20" <br />1 <br />L. F. <br />$ <br />8.10 <br />$ <br />9.20 <br />$ 5.75 <br />$ <br />6.53 <br />$ 13.84 <br />$15.73 <br />(k) 22" <br />1 <br />L, F. <br />$ <br />8.93 <br />$ <br />10.15 <br />$ 5.75 <br />$ <br />6.53 <br />$ 14.68 <br />$16.68 <br />(I) 24" <br />1 <br />L. F. <br />$ <br />9.59 <br />$ <br />10.90 <br />$ 7.66 <br />$ <br />8.71 <br />$ 17.25 <br />$19.60 <br />A47 lRemove Sanitary Sewer Main <br />(a) 8„ <br />1 <br />L. F. <br />NA <br />$ 9.63 <br />$ <br />10.95 <br />$ 9.63 <br />$10.95 <br />(b) 10" <br />1 <br />L. F. <br />NA <br />$ 11.D1 <br />$ <br />12.51 <br />$ 11.01 <br />$12.51 <br />(b) 12" <br />1 <br />L. F. <br />NA <br />$ 12.85 <br />$ <br />14.60 <br />$ 12.85 <br />$14.60 <br />(c) 118., <br />1 <br />L. F. <br />NA <br />$ 19.26 <br />$ <br />21.89 <br />$ 19.26 <br />$21.89 <br />(d) 24" <br />1 <br />L. F. <br />NA <br />$ 22.01 <br />$ <br />25.01 <br />$ 22.01 <br />$25.01 <br />(e) lCost Credit <br />1 <br />L. F. <br />NA <br />$ 0.10 <br />$ <br />0.11 <br />$ 0.10 <br />$0.11 <br />A48 lGrout and Abandon Sanitary Sewer Main <br />(a) 8,. <br />1 1 <br />L. F. <br />$ <br />2.98 <br />$ <br />3.38 <br />$ 4.S9 <br />$ <br />5.22 <br />$ 7.57 <br />$8.60 <br />(b) 10" <br />1 <br />L. F. <br />$ <br />3.97 <br />$ <br />4.51 <br />$ 5.11 <br />$ <br />5.80 <br />$ 9.07 <br />$10.31 <br />(b) 12" <br />1 <br />L. F. <br />$ <br />4.79 <br />$ <br />5.44 <br />$ S.33 <br />$ <br />6.06 <br />$ 10.12 <br />$11.50 <br />(c) 18" <br />1 <br />L. F. <br />$ <br />7.27 <br />$ <br />8.26 <br />$ 6.56 <br />$ <br />7.46 <br />$ 13.84 <br />$15.72 <br />(d) 24" <br />1 <br />L. F. <br />$ <br />9.5?_L$ <br />10.90 <br />$ 11.49 <br />$23.96 <br />5 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.