69TH STREET <br />FM No. 438073-1-54-01 <br />IRC PRojEcr No. 1639 <br />AACE Proposal No. P22-2311 <br />ITEM #1: Field and Lab Testing of FDR Roadwav Base and Shoulders and Roadwav Wideni <br />Page -4- <br />• Road Base Particle Size Analysis of Pulverized Base: <br />- Washed Sieve Analyses; 14 tests @ $95.00/test.................................................. <br />$1,330.00 <br />- Sample Preparation; 14 tests @ $35.00/test....................................................... <br />$490.00 <br />• Marshall Stability of FDR Mixture: 14 tests @ $190.00/test.......................................... <br />$2,660.00 <br />• Moisture/Density Relationship (Proctor) Testing: 14 tests @ $91.00/test ............................... <br />$1,274.00 <br />• LBR Testing; 15 tests @ $315.00/ test ............................................................ <br />$4,725.00 <br />• In -Place Density Testing of FDR Mix, Widening Base & Stabilized Shoulders; <br />- 80 tests @ $25.00/test (minimum 4 tests per hour, per trip) ......................................... <br />$2,000.00 <br />• In -Place Density Testing of Roadway Embankment (as needed); <br />- 25 tests @ $25.00/test (minimum 4 tests per hour, per trip) ........................................... <br />$625.00 <br />• Engineering Technician (man-hours for sample collection, limited standby, etc.) <br />- 65 hours @ $63.00/hour..................................................................... <br />$4,095.00 <br />Item #1 Subtotal: ........................................... $17,199.00 <br />ITEM #2: QC Services During Paving Operations <br />• Asphalt Plant Inspection - Senior Transportation/Roadway Technician; <br />- 3 Days x 10 hours/day @ $85.00/hr. x 1.5 (nighttime testing rate) ................................... $3,825.00 <br />- Asphalt Content and Extraction/Gradation Testing; 3 samples x $210.00/sample ........................ $630.00 <br />• Roadway Coring (3 Coring Events) <br />- Engineering Technician (for Roadway Coring - 2 techs. required for all coring); <br />4 events @ 8 hours/event x @ $63.00/hour x 2 technicians ........................................ $4,032.00 <br />- Coring Mobilization; 4 events x $100.00/mob..................................................... $400.00 <br />- Core Machine Usage;4 days $150.00/day .......................................................$600.00 <br />- Generator Usage; 4 days x $50.00/day............................................................ $200.00 <br />- Specific Gravity Testing (Unit Weight) of Cores; 12 cores x $37.00/core................................ $444.00 <br />Item #2 Subtotal: ........................................... $10,131.00 <br />► ITEM #3: Drainage Construction <br />• Proctor Testing- .5tests @ $91.00/test............................................................. $455.00 <br />• In -Place Density Testing of Excavation Backfill; <br />- 225 tests @ $25.00/test (minimum 4 tests per hour, per trip) ........................................ $5,625.00 <br />• Engineering Technician (man-hour estimate for road closure standby, etc) <br />-30 hours @ $63.00/hour.....................................................................1 8$ , 90.00 <br />Item #3 Subtotal: ............................................ $7,970.00 <br />► ITEM #4: Miscellaneous Testi <br />• Sidewalk, Curbing, ADA Ramp Subgrade: 30 density tests @ $25.00/test................................. $750.00 <br />• Compressive Strength Testing of Concrete (sidewalk, headwall, ramps, etc.); <br />- 8 sets of 4 specimens @ $95.00/set.............................................................. $760.00 <br />• Modified Proctor Testing; 3 tests @ $91.00/test..................................................... $273.00 <br />Item #4 Subtotal: ............................................ $19783.00 <br />► ITEM #5: Professional/Administrative Services Estimate: <br />• Snr. Project Engineer: <br />- Limited Meeting Attendance - 3 meetings x 3 hrs./mtg. x $128.00/hour .............................. $1,152.00 <br />- Project Coordination, review of testing results; 25 weeks x 2 hrs./week x $128.00/hour ................. $6,400.00 <br />• Technical Secretary; 25 weeks x 1.5 hrs./week x $50.00/hour........................................ $1,875.00 <br />Item #5 Subtotal: ............................................ $9,427.00 <br />PROTECT TOTAL: $46,510.00 <br />