Laserfiche WebLink
69TH STREET <br />FM No. 438073-1-54-01 <br />IRC PRojEcr No. 1639 <br />RACE Proposal No. P22-2311 <br />TERMS AND CONDITIONS <br />Page -5- <br />(1) Unit rates apply to standard working days, Monday through Friday, 7:00 a.m to 6:00 p.m. Testing and hourly rates <br />will be increased by 50% for weekend, holiday or after-hours services (i.e., services performed before 7:00 am or <br />after 7:00 pm). Our man-hour rates as presented herein are based on day -time testing only. No allowances for <br />nighttime work are reflected in our fee. <br />(2) The contractor (or County personnel) should contact Andersen Andre Consulting Engineers, Inc. at (772) 807-9191 <br />a minimum of 24 hours prior to any testing and 48 hours prior to weekend and evening work. <br />(3) If our testing estimate for a specific work element is insufficient for that particular activity, resources from another <br />work element can be used without prior authorization from the client as long as our total cost estimate is not <br />exceeded. We will notify you in advance if it appears that the cost estimate presented in the attached unit fee <br />schedule will be exceeded. <br />(4) AACE has not been provided with the selected Contractor's proposed schedule (i.e.; paving days, FDR days, etc.). <br />Therefore, man-hours and associated testing quantities are based on our experience with similar projects. It is <br />possible that our testing budget may require revision based on contractor efficiency, methodology and scheduling. <br />(5) Soil sample and concrete cylinder pickup for laboratory testing (e.g., Proctor, LBR testing, compressive strength, <br />etc.) will be billed at;63.00/hour if not scheduled with other work. <br />(6) Our services do not include reviewing, monitoring or reporting any aspect of the required Maintenance of Traffic <br />(M.O.T.) that may be required for this project. <br />(7) AACE's field technicians and engineers do not direct or witness the performance of any work. Neither the presence <br />of an AACE representative on-site nor the observation and testing performed by our firm implies AACE's <br />responsibility for defects discovered in the construction work. <br />(8) AACE will not be responsible for job or site safety for this project; job site safety will be the sole responsibility of <br />the contractor. <br />(9) AACE will not have stop -work authority. Should our representatives encounter materials or workmanship that, <br />either based on direct testing or on our experience with similar projects, does not appear to meet the engineering <br />plans and specifications, we will notify Indian River County immediately. Results will not be relayed to the <br />Contractor without prior consent of the County. <br />(10) We understand that no FDOT Earthwork/Density Log Book will be required for this project. <br />ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />WWW.AACEINC.COM <br />