My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/21/2022
CBCC
>
Meetings
>
2020's
>
2022
>
06/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 10:31:20 AM
Creation date
7/25/2022 10:11:06 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/21/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2022 -0203 -PAA -EQ <br />DOCKET NO. 20220072 -EQ <br />PAGE 45 <br />r 1.vnrrJH r. v vr.r..n br t.rutr r 1,ILJMYAI4 Y <br />(Continued from Sheet No. 10.315) <br />111. FUEL SUPPLY <br />Attachment A <br />Sheet loo. 111.316 <br />• Describe all fuels to be used to generate electricity at the Facility. Indicate the specific physical and chemical chmacteristics <br />of each fuel type (e.g., Btu content, sulfur content, ash content, etc.). Identify special considerations regarding fuel supply <br />origin, source and handling, storage and processing requirements, <br />• Provide annual fuel requirements (AFR) necessary to support the requirements pursuant to Section 366.91, Florida Statutes, <br />and the planned levels of generation and list the assurnptitms used to delenuino these gtrotttities. <br />• Provide a suuthtnnary of the status of die fuel supply armVements in pace to mcct the ARFR in each year of the proposed <br />operating life of the Facility. Use the categories below to describe the current arrangerneut for securing to AMR <br />Category <br />Description of Fttel Supply Arramcment fuel is from a fully dcveiaped <br />owned = <br />source awned by one or more of the project participants <br />contract = <br />fully executed firm fact contract exists between rte developet(s) and fuel styhplier(s) <br />1.01= <br />a letter orint"d fir the tile[ supply exists between developer(s) and duel supplier(s) <br />REF — <br />renewable energy faedity will bran biomass, waste, or another renxrvable resource <br />spot = <br />fuel supply will be purchased on the spot market <br />none = <br />no firm firer supply arrangement currently in place <br />Other = <br />fuel supply arrangetnett which does not fit arty of the above categories (pease describe) <br />• Indicate the percentage of the Facility's AM which is covered by the above fuel supply arrangemcnt(s) for each proposed <br />o1mratirw year.'rhe percent of AFR covered for each operating year mast total 100%, For fuel supply arrangements identified <br />as owned, contract, or LOI, provide documentation to support this category and exl)lain the fitel price mechanism of the <br />arrangement. In addition indicate wheder or trot the fuel price includes delivery mid, if so, to what location. <br />• Describe fitel tramportation networks available for delivering all primary and secondary Ciel to the Facility site. Indicate 11t <br />mode, route and distance of each sc-gtmcrtt of the journey, from fiel source to die Energy Facility site. Discuss Ute current <br />status and pertinent tactors impacting future availability of the transportation network: <br />• Provide annual fuel Mia. ortatirsn requirements (AFfR) accessary to sttpport planned levels of generation and list the <br />ass utnptiotu used to deternune these quarififies, <br />• Provide a summary of the status of the fuel trrutsportation arrangements in place to meet the ATTR in each year of Ute <br />proposed operating life of tore Energy Facility UW the categories lelow to describe the current arrangement for securing the <br />AFrR. <br />owned fuel transport via a fully devetopxi system owned by one or more of the project participate <br />MUM M fitly executed firm transportation contract exists between the developer(s) and fuel transporter(s) <br />1.171— a letter ofinten# for fuel irarrslxxt exists between developer's) and firel transporter(s) <br />SpcA = fuel transition will be ptrehased on the spot market <br />none - no Finn fuel transportation arrangement ment currently in place <br />other - fuel transportation arrangement which does not fit arty of the above categories (please dttmibe) <br />• Indicate the percentage of the Facility's AFR which is covered by the above fines supply arrangement's) for each proposed <br />operating year, The percent of AFR covered for each operating year must total 1000%. For fuel supply arnmitements identified <br />as owned, conlract, or LOT, provide documentation to support this category and explain the transpwrtation price mechanism of <br />the anartgement. <br />• Provide the maximum, minimum, and average fuel inventory levels to be maintained for primary arks secondary fuels at the <br />Facility site, List the assumptions meed in determining Ute inventory levels. <br />(t Trimmed an Sheet No. 10.317) <br />Issued by, S. i? Romig, Director, Rates and Tariffs <br />Effective: May22,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.