Laserfiche WebLink
and bollards required to protect the scale equipment will result in minor redesign of the <br />grading and drainage plans in the immediate vicinity. <br />Subtask 2.3 — 90 Percent Design and Final Bid Package <br />No change. <br />Task 3: Permitting Services <br />No change. <br />Task 4: Bidding Services <br />No change. <br />Task 5: Construction Phase Services (Not -to -Exceed) <br />The Consultant will provide additional construction phase services to advance the <br />installation of the scale (pre -purchased by SWDD) while the procurement package for the <br />balance of the project is being advertised. It is anticipated that this will require an <br />additional 45 days of construction duration, with periodic site visits by the Consultant. <br />Task 6: Record Drawings <br />No change. <br />Page 2 of 5 <br />