My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-139
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2022 10:52:44 AM
Creation date
8/8/2022 10:51:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/12/2022
Control Number
2022-139
Agenda Item Number
15.B.5
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment No. 2 to CCNA2018 Work Order 44 for Landfill
Gas Flare Skid Improvements and Pipeline Extension Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT NO.2 <br />WORK ORDER NUMBER 44 <br />LANDFILL GAS FLARE SKID IMPROVEMENTS AND PIPELINE EXTENSION <br />EXHIBIT A <br />SCOPE OF WORK <br />PROJECT UNDERSTANDING <br />Indian River County (County) solid waste disposal district (SWDD) currently relies on a <br />candlestick flare for landfill gas (LFG) emissions. The current blower flare skid was <br />installed in 2004 and is in need of updating and reconfiguration for overall performance <br />and efficiency, and to accommodate the renewable natural gas (RNG) project that is in <br />development with the Indian River Eco District (IRED). In addition, SWDD is working <br />with a third -party to install a leachate evaporation system that may utilize landfill gas as a <br />fuel source. To accommodate the RNG and evaporation projects, modifications to the LFG <br />skid and an extension to the LFG pipeline are required. The proposed modifications will <br />improve the LFG collection and control system by providing reliable vacuum pressure to <br />the gas wellfield and ensure continuous delivery of dry, pressurized LFG to the evaporation <br />and RNG projects. <br />Kimley-Horn and Associates, Inc. (Consultant) has partnered with BioGas Engineering <br />(BioGas) to design, permit and bid the proposed improvements. Amendment No. 2 <br />provides for additional geotechnical services related to additional concrete slabs needed <br />for reconfiguration of the skid modifications, review of blower skid proposals from various <br />suppliers, structural design of the concrete slabs, additional meetings, and general project <br />management efforts. <br />SCOPE OF SERVICES <br />Task 1: Landfill Gas Pipeline Design <br />Subtask 1. 1.3 has been amended as noted below. <br />Subtask LI Preliminary Design Activities <br />1.1.1 Alignment for Survey Purposes <br />No changes. <br />1. 1.2 Survey <br />No changes. <br />1.1.3 Geotechnical Data <br />The Consultant will modify the subcontract with a local geotechnical engineering <br />consultant who routinely performs work for the County on the SWDD property to <br />perform additional services to collect geotechnical data in several additional <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.