My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-139
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2022 10:52:44 AM
Creation date
8/8/2022 10:51:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/12/2022
Control Number
2022-139
Agenda Item Number
15.B.5
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment No. 2 to CCNA2018 Work Order 44 for Landfill
Gas Flare Skid Improvements and Pipeline Extension Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
locations for the new slab configuration and addition of the dehydration system. <br />The additional borings are required to supplement the previously budgeted hand <br />auger samples, for structural purposes. <br />Subtask 1.2 Landfill Gas Pipeline Design <br />1.2.1 30 Percent Design <br />No changes. <br />1.2.2 60 Percent Design <br />SWDD requested a realignment of the pipeline to avoid a conflict with the ongoing <br />project to underground the existing overhead electrical lines. This resulted in a <br />redesign and an evaluation of horizontal directional drill versus open trench <br />construction methods. The Consultant will provide additional coordination and <br />alignment services for the subconsultant designing the pipeline. <br />1.2.3 90 Percent Design and Final Bid Package <br />No changes <br />1.2.4 Bidding and Project Management <br />No changes <br />Subtask 1.3 Coordination with Heartland <br />No changes. <br />Task 2: Landfill Gas Skid Design <br />Subtasks 2.3, 2.4 and 2.5 have been modified to accommodate minor changes to the scope <br />of the project. <br />Subtask 2.1 Request for Information <br />No changes. <br />Subtask 2.2 30 Percent Design <br />No changes. <br />Subtask 2.3 60 Percent Design <br />The County requested that the Consultant review three bids received from three suppliers <br />for the LFG Blower Skid package. This included additional coordination with the suppliers <br />to verify and adjust pricing to be comparable amongst all three. This evaluation was not <br />anticipated nor included in the original Scope of Services. This task also included <br />coordination with the subconsultant on the configuration of the additional dehydration <br />system equipment and skid (added after the original Scope of Services was authorized). <br />Subtask 2.4 90 Percent Design and Final Bid Package <br />The original Scope of Services assumed that the existing equipment slab would be utilized <br />for the installation of the new equipment (and that the LFG system would be taken out of <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.