Laserfiche WebLink
future land <br />agricultural <br />unit/5 acres. <br />Environment <br />use map. The AG -1 designation is intended for <br />uses and residential uses with densities up to 1 <br />Being a site that has been cleared for agriculture, the subject <br />property is not designated as environmentally important or <br />environmentally sensitive by the comprehensive plan. No wetlands <br />or native upland plant communities exist on site. According to <br />Flood Insurance Rating Maps, the subject property does not contain <br />any flood hazard areas. <br />Utilities and Services <br />The site is within the Urban Service Area of the county; however, <br />neither water nor wastewater lines extend to the site at this time. <br />Transportation System <br />The property is bordered by 66th Avenue which is classified as an <br />urban minor arterial road on the future roadway thoroughfare plan <br />map. The segment of 66th Avenue adjacent to the subject property <br />is a two lane road with approximately 50 feet of public road right- <br />of-way. This segment of 66th Avenue is programmed for expansion to <br />four lanes and 80 feet of public road right-of-way by 2010. <br />Additionally, the site abuts 33rd Street. Classified as a <br />collector road on the future roadway thoroughfare plan map, the <br />segment of 33rd Street adjacent to the site is a two-lane paved <br />road with approximately 30 feet of public road right-of-way. This <br />segment of 33rd Street is not programmed for expansion at this <br />time. <br />Concurrency of Public Facilities <br />This site is located within the county Urban Service Area, an area <br />deemed suited for urban scale development. The Comprehensive Plan <br />establishes standards for: Transportation, Potable Water, <br />Wastewater, Solid Waste, Drainage and Recreation (Future Land Use <br />Policy 3.1). The adequate provision of these services is necessary <br />to ensure the continued quality of life enjoyed by the community. <br />The Comprehensive Plan and Land Development Regulations also <br />require that new development be reviewed to ensure that the minimum <br />acceptable standards for these services and facilities are <br />maintained. <br />AMAT.vS T S <br />In this section, an analysis of the reasonableness of the <br />application will be presented. The analysis will include a <br />description of: <br />• concurrency of public facilities; <br />• compatibility with the surrounding area; <br />• consistency with the comprehensive plan; and <br />• potential impact on environmental quality. <br />Policy 3.2 of the Future Land Use Element states that no <br />development shall be approved unless it is consistent with the <br />concurrency management system component of the Capital Improvements <br />Element. For rezoning requests, conditional concurrency review is <br />required. <br />Conditional concurrency review examines the available capacity of <br />each facility with respect to a proposed project. Since rezoning <br />requests are not projects, county regulations call for the <br />concurrency review to be based upon the most intense use of the <br />subject property based upon the requested zoning district. <br />DECEMBER 5, 1995 19 Bou 96 PAGE 715 <br />