Laserfiche WebLink
Exhibit 1 - Amendment 11CK Contractors & Development) <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price Bid <br />Revised Unit <br />Price Material <br />Installed Unit <br />Price Bid <br />Revised Unit <br />Price Install <br />Total Unit Price <br />(Material + <br />Installation) <br />Revised total unit <br />Price (Material + <br />Installation) <br />A49 Remove Sanitary Sewer Manhole <br />(a) 0'-6' <br />1 <br />EA. <br />$ <br />316.21 <br />$ 359.37 <br />$ 848.96 <br />$ <br />964.84 <br />$ 1,165.17 <br />$1,324.22 <br />(b) 6'-8' <br />1 <br />EA. <br />$ <br />316.21 <br />$ 359.37 <br />$ 848.96 <br />$ <br />964.84 <br />$ 1,165.17 <br />$1,324.22 <br />(c) 8'-10' <br />1 <br />EA. <br />$ <br />474.83 <br />$ 539.64 <br />$ 1,234.24 <br />$ <br />1,402.71 <br />$ 1,709.07 <br />$1,942.36 <br />(d) 10'-12' <br />1 <br />EA. <br />$ <br />474.83 <br />$ 539.64 <br />$ 1,281.28 <br />$ <br />1,456.17 <br />$ 1,756.11 <br />$1,995.82 <br />(e) 12'-14' <br />1 <br />EA. <br />$ <br />592.25 <br />$ 673.09 <br />$ 1,498.56 <br />$ <br />1,703.11 <br />$ 2,090.81 <br />$2,376.21 <br />A50 Outside drop on Manhole <br />(a) 6'-8' <br />1 <br />EA. <br />$ <br />644.78 <br />$ 732.79 <br />$ 1,105.44 <br />$ <br />1,256.33 <br />$ 1,750.22 <br />$1,989.13 <br />(b) 8'-l0' <br />1 <br />EA. <br />$ <br />747.78 <br />$ 849.85 <br />$ 1,105.44 <br />$ <br />1,256.33 <br />$ 1,853.22 <br />$2,106.18 <br />(c) 10'-12' <br />1 <br />EA. <br />$ <br />1,056.78 <br />$ 1,201.03 <br />$ 1,284.64 <br />$ <br />1,459.99 <br />$ 2,341.42 <br />$2,661.02 <br />A51 Relocate Fire Hydrant <br />1 <br />EA. <br />$ <br />242.OS <br />$ 275.09 <br />$ 1,428.00 <br />$ <br />1,622.92 <br />$ 1,670.05 <br />$1,898.01 <br />A52 2" Jumper Connection <br />1 <br />EA. <br />$ <br />1,478.05 <br />$ 1,679.80 <br />$ 873.60 <br />$ <br />992.85 <br />$ 2,351.65 <br />$2,672.65 <br />A53 Asbestos Pipe Abatment <br />(a) 6" <br />1 <br />L. F. <br />NA <br />$ 73.92 <br />$ <br />84.01 <br />$ 73.92 <br />$84.01 <br />(b) 8" <br />1 <br />L. F. <br />NA <br />$ 75.04 <br />$ <br />85.28 <br />$ 75.04 <br />$85.28 <br />(c) 10" <br />1 <br />L. F. <br />NA <br />$ 76.16 <br />$ <br />86.56 <br />$ 76.16 <br />$86.56 <br />(d) 12" <br />1 <br />L. F. <br />NA <br />$ 77.44 <br />$ <br />88.01 <br />$ 77.44 <br />$88.01 <br />(e) 16" <br />1 <br />L. F. <br />NA <br />$ 79.07 <br />$ <br />89.87 <br />$ 79.07 <br />$89.87 <br />A54 Root Barrier <br />1 <br />L.F. <br />$ <br />16.53 <br />$ 18.79 <br />$ 11.20 <br />$ <br />12.73 <br />$ 27.73 <br />$31.52 <br />A55 Utility Pole Support <br />1 <br />EA <br />$ <br />10.30 <br />$ 11.71 <br />$ 1,484.00 <br />$ <br />1,686.57 <br />$ 1,494.30 <br />$1,698.27 <br />A56 Remove and Reinstall Trees <br />1 <br />EA <br />$ <br />463.50 <br />$ 526.77 <br />$ 280.00 <br />$ <br />318.22 <br />$ 743.50 <br />$844.99 <br />A57 Schedule 40 PVC Casing Pipe <br />(a) 4" <br />1 <br />L.F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(b) 6" <br />1 <br />L.F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(c) 8" <br />1 <br />L.F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(d) l0" <br />1 <br />L.F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(e) 12" <br />1 <br />L.F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(f) 14" <br />1 <br />L.F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(g) 16" <br />1 <br />L. F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(h) 18" <br />1 <br />L. F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(i) 20" <br />1 <br />L.F. <br />NA <br />j $ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(j) 22" <br />1 <br />L. F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(k) 24" <br />1 <br />L. F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />A58 Steel casing <br />(a) 4" <br />1 <br />L. F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(b) 6" <br />1 <br />L. F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(c) 8" <br />1 <br />L. F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(d) 10" <br />1 <br />L. F. <br />NA <br />$ 9.78 <br />$ <br />11.11 <br />$ 9.78 <br />$11.11 <br />(e) 12" <br />1 <br />L. F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(f) 14" <br />1 <br />L. F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(g) 16" <br />1 <br />L. F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(h) 18" <br />1 <br />L. F, <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(i) 20" <br />1 <br />L. F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(j) 22" <br />1 <br />L.F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />(k) 24" <br />1 <br />L.F. <br />NA <br />$ 12.06 <br />$ <br />13.71 <br />$ 12.06 <br />$13.71 <br />SECTION B -Restoration <br />B1 Pavement Repair and Replacement <br />(a) Asphalt Road <br />1 <br />S.Y. <br />$ <br />19.57 <br />$ 22.24 <br />$ 24.64 <br />$ <br />28.00 <br />$ 44.21 <br />$50.24 <br />(b) Asphalt Driveway <br />1 <br />S.Y. <br />$ <br />20.60 <br />$ 23.41 <br />$ 24.64 <br />$ <br />28.00 <br />$ 45.24 <br />$51.42 <br />(c) Asphalt Millings <br />1 <br />S.Y. <br />$ <br />6.18 <br />$ 7.02 <br />$ 24.64 <br />$ <br />28.00 <br />$ 30.82 <br />$35.03 <br />(d) Asphalt overlay <br />1 <br />S.Y. <br />$ <br />4.64 <br />$ 5.27 <br />$ 14.00 <br />$ <br />15.91 <br />$ 18.64 <br />$21.18 <br />(e) Add. S-3 Asphalt <br />1 <br />Ton <br />$ <br />108.15 <br />$ 122.91 <br />$ 72.80 <br />$ <br />82.74 <br />$ 180.95 <br />$205.65 <br />(f) Cold Mix Asphalt <br />1 <br />Ton <br />$ <br />77.25 <br />$ 87.79 <br />$ 22.40 <br />$ <br />25.46 <br />$ 99.65 <br />$113.25 <br />(g) Concrete Driveway (6") <br />1 <br />S.Y. <br />$ <br />46.35 <br />$ 52.68 <br />$ 11.20 <br />$ <br />12.73 <br />$ 57.55 <br />$65.41 <br />(h) Concrete Sidewalk (4") <br />1 <br />S.Y. <br />$ <br />36.05 <br />$ 40.97 <br />$ 11.20 <br />$ <br />12.73 <br />$ 47.25 <br />$53.70 <br />(i) Concrete Curb <br />1. Curb and Gutter <br />1 <br />L. F. <br />$ <br />17.51 <br />$ 19.90 <br />$ 7.84 <br />$ <br />8.91 <br />$ 25.35 <br />$28.81 <br />2.'D'Curb <br />1 <br />L. F. <br />$ <br />16.48 <br />$ 18.73 <br />$ 3.36 <br />$ <br />3.82 <br />$ 19.84 <br />$22.55 <br />(j) Concrete Driveway Paver Block <br />1 <br />S.Y. <br />$ <br />43.26 <br />$ 49.16 <br />$ 8.96 <br />$ <br />10.18 <br />$ 52.22 <br />$59.35 <br />(k) Lime rock Driveway <br />1 <br />S.Y. <br />$ <br />18.03 <br />$ 20.49 <br />$ 8.40 <br />$ <br />9.55 <br />$ 26.43 <br />$30.03 <br />6 of 17 19 <br />