Exhibit 1 -Amendment 11CK Contractors & Develonmenti
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Material Unit
<br />Price Bid
<br />Revised Unit
<br />Price Material
<br />Installed Unit
<br />Price Bid
<br />Revised Unit
<br />Price Install
<br />Total Unit Price
<br />(Material +
<br />Installation)
<br />Revised total unit
<br />Price (Material +
<br />Installation)
<br />(1)
<br />jAsphalt sidewalk
<br />1
<br />S.Y.
<br />$
<br />18.54
<br />$ 21.07
<br />$ 28.00
<br />$
<br />31.82
<br />$ 46.54
<br />$52.89
<br />B2
<br />Milling Asphalt
<br />1
<br />S.Y.
<br />$
<br />5.15
<br />$ 5.85
<br />$ 16.80
<br />$
<br />19.09
<br />$ 21.95
<br />$24.95
<br />B3
<br />Coquina Rock Base
<br />1
<br />C.Y.
<br />$
<br />14.94
<br />$ 16.97
<br />$ 8.96
<br />$
<br />10.18
<br />$ 23.90
<br />$27.16
<br />B4
<br />Flowable Fill
<br />(a) 0 - 4 cy (include short load fees)
<br />1
<br />C.Y.
<br />$
<br />169.95
<br />$ 193.15
<br />$ 22.40
<br />$
<br />25.46
<br />$ 192.35
<br />$218.61
<br />(b) 14 - 8 cy (include short load fees)
<br />1
<br />C.Y.
<br />$
<br />159.65
<br />$ 181.44
<br />$ 20.16
<br />$
<br />22.91
<br />$ 179.81
<br />$204.35
<br />(c) 1>8cy
<br />1
<br />C.Y.
<br />$
<br />139.05
<br />$ 158.03
<br />$ 17.92
<br />$
<br />20.37
<br />$ 156.97
<br />$178.40
<br />B5
<br />Miscellaneous Materials
<br />(a) Sand
<br />1
<br />C.Y.
<br />$
<br />7.21
<br />$ 8.19
<br />$ 28.00
<br />$
<br />31.82
<br />$ 35.21
<br />$40.02
<br />(b) Fill
<br />1
<br />C.Y.
<br />$
<br />5.67
<br />$ 6.44
<br />$ 39.20
<br />$
<br />44.55
<br />$ 44.87
<br />$50.99
<br />(c) #57 Rock
<br />1
<br />C.Y.
<br />$
<br />30.90
<br />$ 35.12
<br />$ 35.84
<br />$
<br />40.73
<br />$ 66.74
<br />$75.85
<br />(d) Shell Rock
<br />1
<br />C.Y.
<br />$
<br />28.84
<br />$ 32.78
<br />$ 35.84
<br />$
<br />40.73
<br />$ 64.68
<br />$73.51
<br />(e) Suremix Concrete 80#
<br />1
<br />Bag
<br />$
<br />11.02
<br />$ 12.53
<br />$ 13.44
<br />$
<br />15.27
<br />$ 24.46
<br />$27.80
<br />B6
<br />Sod Replacement
<br />(a)
<br />Bahia
<br />1
<br />S.Y.
<br />$
<br />1.08
<br />$ 1.23
<br />$ 1.18
<br />$
<br />1.34
<br />$ 2.26
<br />$2.57
<br />(b)
<br />Floratam
<br />1
<br />S.Y.
<br />$
<br />2.16
<br />$ 2.46
<br />$ 2.30
<br />$
<br />2.61
<br />$ 4.46
<br />$5.07
<br />B7
<br />Seed and Mulch
<br />1
<br />S.Y.
<br />$
<br />1.60
<br />$ 1.81
<br />$ 1.74
<br />$
<br />1.97
<br />$ 3.33
<br />$3.79
<br />B8
<br />Mailbox Removal and Reinstallation
<br />1
<br />EA
<br />$
<br />10.30
<br />$ 11.71
<br />$ 140.00
<br />$
<br />159.11
<br />$ 150.30
<br />$170.82
<br />B9
<br />Sprinkler System Repair per Yard
<br />1
<br />EA
<br />$
<br />103.00
<br />$ 117.06
<br />$ 140.00
<br />$
<br />159.11
<br />$ 243.00
<br />$276.17
<br />B10 Handicap Ramp Restoration
<br />1
<br />EA
<br />$
<br />901.25
<br />$ 1,024.27
<br />$ 1,512.00
<br />$
<br />1,718.39
<br />$ 2,413.25
<br />$2,742.66
<br />SECTION C - High Density Polyethylene Piping & Horizontal Directional Boring
<br />C1
<br />High Density Polyethylene Pipe (HDPE) -Trench
<br />(a) 2 -inch
<br />1
<br />L. F.
<br />$
<br />1.24
<br />$ 1.40
<br />$ 7.34
<br />$
<br />8.34
<br />$ 8.57
<br />$9.74
<br />(b) 4 -inch
<br />1
<br />L. F.
<br />$
<br />4.96
<br />$ 5.64
<br />$ 8.40
<br />$
<br />9.55
<br />$ 13.36
<br />$15.19
<br />(c) 6 -inch
<br />1
<br />L. F.
<br />$
<br />9.92
<br />$ 11.27
<br />$ 9.80
<br />$
<br />11.14
<br />$ 19.72
<br />$22.41
<br />(d) 8 -inch
<br />1
<br />L. F.
<br />$
<br />14.33
<br />$ 16.28
<br />$ 10.64
<br />$
<br />12.09
<br />$ 24.97
<br />$28.38
<br />(e) 12 inch
<br />1
<br />L. F.
<br />$
<br />35.27
<br />$ 40.08
<br />$ 9.80
<br />$
<br />11.14
<br />$ 45.07
<br />$51.22
<br />(f) 16 -inch
<br />1
<br />L. F.
<br />$
<br />60.62
<br />$ 68.89
<br />$ 9.80
<br />$
<br />11.14
<br />$ 70.42
<br />$80.03
<br />(g) 18 -inch
<br />1
<br />L. F.
<br />$
<br />94.78
<br />$ 107.72
<br />$ 9.80
<br />$
<br />11.14
<br />$ 104.58
<br />$118.86
<br />(h) 20 -inch
<br />1
<br />L. F.
<br />$
<br />99.19
<br />$ 112.73
<br />$ 9.80
<br />$
<br />11.14
<br />$ 108.99
<br />$123.87
<br />(i) 24 -inch
<br />1
<br />L. F.
<br />$
<br />110.21
<br />$ 125.25
<br />$ 9.80
<br />$
<br />11.14
<br />$ 120.01
<br />$136.39
<br />C2
<br />Horizontal Directional Boring (HDPE) -HDD
<br />(b) 4 -inch
<br />1
<br />L. F.
<br />$
<br />4.96
<br />$ 5.64
<br />$ 178.08
<br />$
<br />202.39
<br />$ 183.04
<br />$208.03
<br />(c) 6 -inch
<br />1
<br />L. F.
<br />$
<br />9.92
<br />$ 11.27
<br />$ 328.16
<br />$
<br />372.95
<br />$ 338.08
<br />$384.23
<br />(d) 8 -inch
<br />1
<br />L. F.
<br />$
<br />14.33
<br />$ 16.28
<br />$ 338.24
<br />$
<br />384.41
<br />$ 352.57
<br />$400.69
<br />(e) 12 inch
<br />1
<br />L. F.
<br />$
<br />35.27
<br />$ 40.08
<br />$ 836.64
<br />$
<br />950.84
<br />$ 871.91
<br />$990.92
<br />(f) 16 -inch
<br />1
<br />L. F.
<br />$
<br />60.62
<br />$ 68.89
<br />$ 875.84
<br />$
<br />995.39
<br />$ 936.46
<br />$1,064.28
<br />(g) 18 -inch
<br />1
<br />L. F.
<br />$
<br />94.78
<br />$ 107.72
<br />$ 898.24
<br />$
<br />1,020.85
<br />$ 993.02
<br />$1,128.57
<br />h 20 -inch
<br />1
<br />L. F.
<br />$
<br />99.19
<br />$ 112.73
<br />$ 985.60
<br />$
<br />1,120.13
<br />$ 1,084.79
<br />$1,232.86
<br />(i) 24 -inch
<br />1
<br />L. F.
<br />$
<br />110.21
<br />$ 125.25
<br />$ 1,052.80
<br />$
<br />1,196.51
<br />$ 1,163.01
<br />$1,321.76
<br />C3
<br />Horizontally Directional Drilled -PVC Driveway Bores
<br />20 -foot length
<br />(a) 4 -inch
<br />1
<br />EA.
<br />$
<br />98.88
<br />$ 112.38
<br />$ 1,083.04
<br />$
<br />1,230.87
<br />$ 1,181.92
<br />$1,343.25
<br />(b) 6 -inch
<br />1
<br />EA.
<br />$
<br />198.79
<br />$ 225.92
<br />$ 1,618.40
<br />$
<br />1,839.31
<br />$ 1,817.19
<br />$2,065.24
<br />(c) 8 -inch
<br />1
<br />EA.
<br />$
<br />295.61
<br />$ 335.96
<br />$ 1,898.40
<br />$
<br />2,157.53
<br />$ 2,194.01
<br />$2,493.49
<br />(d) 12 -inch
<br />1
<br />EA.
<br />1 $
<br />705.55
<br />$ 801.86
<br />$ 3,186.40
<br />$
<br />3,621.34
<br />$ 3,891.95
<br />$4,423.20
<br />40 -foot length
<br />(a) 4 -inch
<br />1
<br />EA.
<br />$
<br />198.79
<br />$ 225.92
<br />$ 1,472.80
<br />$
<br />1,673.84
<br />$ 1,671.59
<br />$1,899.76
<br />(b) 6 -inch
<br />1
<br />EA.
<br />$
<br />396.55
<br />$ 450.68
<br />$ 1,898.40
<br />$
<br />2,157.53
<br />$ 2,294.95
<br />$2,608.21
<br />(c) 8 -inch
<br />1
<br />EA.
<br />$
<br />590.19
<br />$ 670.75
<br />$ 2,738.40
<br />$
<br />3,112.19
<br />$ 3,328.59
<br />$3,782.94
<br />(d) 12 -inch
<br />1
<br />EA.
<br />$
<br />1,411.10
<br />$ 1,603.72
<br />$ 6,546.40
<br />$
<br />7,439.98
<br />$ 7,957.50
<br />$9,043.70
<br />60 -foot length
<br />(a) 4 -inch
<br />1
<br />EA.
<br />$
<br />297.67
<br />$ 338.30
<br />$ 1,864.80
<br />$
<br />2,119.35
<br />$ 2,162.47
<br />$2,457.65
<br />(b) 6 -inch
<br />1
<br />EA.
<br />$
<br />595.34
<br />$ 676.60
<br />$ 2,850.40
<br />$
<br />3,239.48
<br />$ 3,445.74
<br />$3,916.08
<br />(c) 8 -inch
<br />1
<br />EA.
<br />$
<br />885.80
<br />$ 1,006.71
<br />$ 5,034.40
<br />$
<br />5,721.60
<br />$ 5,920.20
<br />$6,728.31
<br />(d) 12 -inch
<br />1
<br />EA.
<br />$
<br />2,116.65
<br />$ 2,405.57
<br />$ 8,898.40
<br />$ 10,113.03
<br />$ 11,015.05
<br />$12,518.60
<br />SECTION D: Time and Materials Rates (TO BE USED ON T&M ORDERS ONLY)
<br />D1
<br />Equipment Hourly Rates
<br />(a) Trackhoe (specify model)
<br />(medium)
<br />1
<br />Hr.
<br />NA
<br />$ 115.00
<br />$
<br />130.70
<br />$ 115.00
<br />$130.70
<br />(large)
<br />1
<br />Hr.
<br />NA
<br />$ 115.00
<br />$
<br />130.70
<br />$ 115.00
<br />$130.70
<br />(b) Combination Backhoe
<br />1
<br />Hr.
<br />NA
<br />$ 50.00
<br />$
<br />56.83
<br />$ 50.00
<br />$56.83
<br />7 of 17 20
<br />
|