Laserfiche WebLink
Exhibit 1 -Amendment 11CK Contractors & Develonmenti <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price Bid <br />Revised Unit <br />Price Material <br />Installed Unit <br />Price Bid <br />Revised Unit <br />Price Install <br />Total Unit Price <br />(Material + <br />Installation) <br />Revised total unit <br />Price (Material + <br />Installation) <br />(1) <br />jAsphalt sidewalk <br />1 <br />S.Y. <br />$ <br />18.54 <br />$ 21.07 <br />$ 28.00 <br />$ <br />31.82 <br />$ 46.54 <br />$52.89 <br />B2 <br />Milling Asphalt <br />1 <br />S.Y. <br />$ <br />5.15 <br />$ 5.85 <br />$ 16.80 <br />$ <br />19.09 <br />$ 21.95 <br />$24.95 <br />B3 <br />Coquina Rock Base <br />1 <br />C.Y. <br />$ <br />14.94 <br />$ 16.97 <br />$ 8.96 <br />$ <br />10.18 <br />$ 23.90 <br />$27.16 <br />B4 <br />Flowable Fill <br />(a) 0 - 4 cy (include short load fees) <br />1 <br />C.Y. <br />$ <br />169.95 <br />$ 193.15 <br />$ 22.40 <br />$ <br />25.46 <br />$ 192.35 <br />$218.61 <br />(b) 14 - 8 cy (include short load fees) <br />1 <br />C.Y. <br />$ <br />159.65 <br />$ 181.44 <br />$ 20.16 <br />$ <br />22.91 <br />$ 179.81 <br />$204.35 <br />(c) 1>8cy <br />1 <br />C.Y. <br />$ <br />139.05 <br />$ 158.03 <br />$ 17.92 <br />$ <br />20.37 <br />$ 156.97 <br />$178.40 <br />B5 <br />Miscellaneous Materials <br />(a) Sand <br />1 <br />C.Y. <br />$ <br />7.21 <br />$ 8.19 <br />$ 28.00 <br />$ <br />31.82 <br />$ 35.21 <br />$40.02 <br />(b) Fill <br />1 <br />C.Y. <br />$ <br />5.67 <br />$ 6.44 <br />$ 39.20 <br />$ <br />44.55 <br />$ 44.87 <br />$50.99 <br />(c) #57 Rock <br />1 <br />C.Y. <br />$ <br />30.90 <br />$ 35.12 <br />$ 35.84 <br />$ <br />40.73 <br />$ 66.74 <br />$75.85 <br />(d) Shell Rock <br />1 <br />C.Y. <br />$ <br />28.84 <br />$ 32.78 <br />$ 35.84 <br />$ <br />40.73 <br />$ 64.68 <br />$73.51 <br />(e) Suremix Concrete 80# <br />1 <br />Bag <br />$ <br />11.02 <br />$ 12.53 <br />$ 13.44 <br />$ <br />15.27 <br />$ 24.46 <br />$27.80 <br />B6 <br />Sod Replacement <br />(a) <br />Bahia <br />1 <br />S.Y. <br />$ <br />1.08 <br />$ 1.23 <br />$ 1.18 <br />$ <br />1.34 <br />$ 2.26 <br />$2.57 <br />(b) <br />Floratam <br />1 <br />S.Y. <br />$ <br />2.16 <br />$ 2.46 <br />$ 2.30 <br />$ <br />2.61 <br />$ 4.46 <br />$5.07 <br />B7 <br />Seed and Mulch <br />1 <br />S.Y. <br />$ <br />1.60 <br />$ 1.81 <br />$ 1.74 <br />$ <br />1.97 <br />$ 3.33 <br />$3.79 <br />B8 <br />Mailbox Removal and Reinstallation <br />1 <br />EA <br />$ <br />10.30 <br />$ 11.71 <br />$ 140.00 <br />$ <br />159.11 <br />$ 150.30 <br />$170.82 <br />B9 <br />Sprinkler System Repair per Yard <br />1 <br />EA <br />$ <br />103.00 <br />$ 117.06 <br />$ 140.00 <br />$ <br />159.11 <br />$ 243.00 <br />$276.17 <br />B10 Handicap Ramp Restoration <br />1 <br />EA <br />$ <br />901.25 <br />$ 1,024.27 <br />$ 1,512.00 <br />$ <br />1,718.39 <br />$ 2,413.25 <br />$2,742.66 <br />SECTION C - High Density Polyethylene Piping & Horizontal Directional Boring <br />C1 <br />High Density Polyethylene Pipe (HDPE) -Trench <br />(a) 2 -inch <br />1 <br />L. F. <br />$ <br />1.24 <br />$ 1.40 <br />$ 7.34 <br />$ <br />8.34 <br />$ 8.57 <br />$9.74 <br />(b) 4 -inch <br />1 <br />L. F. <br />$ <br />4.96 <br />$ 5.64 <br />$ 8.40 <br />$ <br />9.55 <br />$ 13.36 <br />$15.19 <br />(c) 6 -inch <br />1 <br />L. F. <br />$ <br />9.92 <br />$ 11.27 <br />$ 9.80 <br />$ <br />11.14 <br />$ 19.72 <br />$22.41 <br />(d) 8 -inch <br />1 <br />L. F. <br />$ <br />14.33 <br />$ 16.28 <br />$ 10.64 <br />$ <br />12.09 <br />$ 24.97 <br />$28.38 <br />(e) 12 inch <br />1 <br />L. F. <br />$ <br />35.27 <br />$ 40.08 <br />$ 9.80 <br />$ <br />11.14 <br />$ 45.07 <br />$51.22 <br />(f) 16 -inch <br />1 <br />L. F. <br />$ <br />60.62 <br />$ 68.89 <br />$ 9.80 <br />$ <br />11.14 <br />$ 70.42 <br />$80.03 <br />(g) 18 -inch <br />1 <br />L. F. <br />$ <br />94.78 <br />$ 107.72 <br />$ 9.80 <br />$ <br />11.14 <br />$ 104.58 <br />$118.86 <br />(h) 20 -inch <br />1 <br />L. F. <br />$ <br />99.19 <br />$ 112.73 <br />$ 9.80 <br />$ <br />11.14 <br />$ 108.99 <br />$123.87 <br />(i) 24 -inch <br />1 <br />L. F. <br />$ <br />110.21 <br />$ 125.25 <br />$ 9.80 <br />$ <br />11.14 <br />$ 120.01 <br />$136.39 <br />C2 <br />Horizontal Directional Boring (HDPE) -HDD <br />(b) 4 -inch <br />1 <br />L. F. <br />$ <br />4.96 <br />$ 5.64 <br />$ 178.08 <br />$ <br />202.39 <br />$ 183.04 <br />$208.03 <br />(c) 6 -inch <br />1 <br />L. F. <br />$ <br />9.92 <br />$ 11.27 <br />$ 328.16 <br />$ <br />372.95 <br />$ 338.08 <br />$384.23 <br />(d) 8 -inch <br />1 <br />L. F. <br />$ <br />14.33 <br />$ 16.28 <br />$ 338.24 <br />$ <br />384.41 <br />$ 352.57 <br />$400.69 <br />(e) 12 inch <br />1 <br />L. F. <br />$ <br />35.27 <br />$ 40.08 <br />$ 836.64 <br />$ <br />950.84 <br />$ 871.91 <br />$990.92 <br />(f) 16 -inch <br />1 <br />L. F. <br />$ <br />60.62 <br />$ 68.89 <br />$ 875.84 <br />$ <br />995.39 <br />$ 936.46 <br />$1,064.28 <br />(g) 18 -inch <br />1 <br />L. F. <br />$ <br />94.78 <br />$ 107.72 <br />$ 898.24 <br />$ <br />1,020.85 <br />$ 993.02 <br />$1,128.57 <br />h 20 -inch <br />1 <br />L. F. <br />$ <br />99.19 <br />$ 112.73 <br />$ 985.60 <br />$ <br />1,120.13 <br />$ 1,084.79 <br />$1,232.86 <br />(i) 24 -inch <br />1 <br />L. F. <br />$ <br />110.21 <br />$ 125.25 <br />$ 1,052.80 <br />$ <br />1,196.51 <br />$ 1,163.01 <br />$1,321.76 <br />C3 <br />Horizontally Directional Drilled -PVC Driveway Bores <br />20 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />98.88 <br />$ 112.38 <br />$ 1,083.04 <br />$ <br />1,230.87 <br />$ 1,181.92 <br />$1,343.25 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />198.79 <br />$ 225.92 <br />$ 1,618.40 <br />$ <br />1,839.31 <br />$ 1,817.19 <br />$2,065.24 <br />(c) 8 -inch <br />1 <br />EA. <br />$ <br />295.61 <br />$ 335.96 <br />$ 1,898.40 <br />$ <br />2,157.53 <br />$ 2,194.01 <br />$2,493.49 <br />(d) 12 -inch <br />1 <br />EA. <br />1 $ <br />705.55 <br />$ 801.86 <br />$ 3,186.40 <br />$ <br />3,621.34 <br />$ 3,891.95 <br />$4,423.20 <br />40 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />198.79 <br />$ 225.92 <br />$ 1,472.80 <br />$ <br />1,673.84 <br />$ 1,671.59 <br />$1,899.76 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />396.55 <br />$ 450.68 <br />$ 1,898.40 <br />$ <br />2,157.53 <br />$ 2,294.95 <br />$2,608.21 <br />(c) 8 -inch <br />1 <br />EA. <br />$ <br />590.19 <br />$ 670.75 <br />$ 2,738.40 <br />$ <br />3,112.19 <br />$ 3,328.59 <br />$3,782.94 <br />(d) 12 -inch <br />1 <br />EA. <br />$ <br />1,411.10 <br />$ 1,603.72 <br />$ 6,546.40 <br />$ <br />7,439.98 <br />$ 7,957.50 <br />$9,043.70 <br />60 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />297.67 <br />$ 338.30 <br />$ 1,864.80 <br />$ <br />2,119.35 <br />$ 2,162.47 <br />$2,457.65 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />595.34 <br />$ 676.60 <br />$ 2,850.40 <br />$ <br />3,239.48 <br />$ 3,445.74 <br />$3,916.08 <br />(c) 8 -inch <br />1 <br />EA. <br />$ <br />885.80 <br />$ 1,006.71 <br />$ 5,034.40 <br />$ <br />5,721.60 <br />$ 5,920.20 <br />$6,728.31 <br />(d) 12 -inch <br />1 <br />EA. <br />$ <br />2,116.65 <br />$ 2,405.57 <br />$ 8,898.40 <br />$ 10,113.03 <br />$ 11,015.05 <br />$12,518.60 <br />SECTION D: Time and Materials Rates (TO BE USED ON T&M ORDERS ONLY) <br />D1 <br />Equipment Hourly Rates <br />(a) Trackhoe (specify model) <br />(medium) <br />1 <br />Hr. <br />NA <br />$ 115.00 <br />$ <br />130.70 <br />$ 115.00 <br />$130.70 <br />(large) <br />1 <br />Hr. <br />NA <br />$ 115.00 <br />$ <br />130.70 <br />$ 115.00 <br />$130.70 <br />(b) Combination Backhoe <br />1 <br />Hr. <br />NA <br />$ 50.00 <br />$ <br />56.83 <br />$ 50.00 <br />$56.83 <br />7 of 17 20 <br />